Loading map…

North Shenango Township

Anti-Data Center Policies

Crawford County’s upcoming rules would impose major hurdles on new or expanded data centers where municipalities lack their own land-development ordinance.

Rating and summary from Crawford County as there are no scored current or future laws outside temporary restrictions for North Shenango Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · North Shenango Township
The draft was posted by the township for the supervisors' consideration and listed for township Planning Commission review in August 2026, no public hearing or adoption has been recorded through the October 1, 2026 supervisors agenda, and the current zoning ordinance (Ordinance No. 133, 1982) does not list or define data centers.North Shenango Township, Crawford County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose technical studies and utility checks, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements23
  • Conditional use decided by the Supervisors after a hearing, § 701A; approval expires after 24 months, not 1 year, § 701B(D).

  • Accessory uses limited to 35% of the tract area; no footprint or megawatt cap, § 704.40(z)(4)

  • 400 ft from residential districts and existing homes, or 200 ft if sound studies show compliance, § 704.40(g)(3)

  • Tree survey and replacement planting only; no riparian buffer or impact assessment, § 704.40(e)(2)

  • Financial security by phase only; no phasing plan or new approval for expansion, § 704.40(f)(3)

  • Single limit of 65 dBA at all hours at residential and institutional lot lines, § 704.40(j)(4)

  • Pre-construction and post-construction sound studies, the latter before an occupancy permit, § 704.40(j)(1)

  • Diesel generators to be used sparingly; no testing hours or hours cap, § 704.40(l)(2)

  • Letter from the water provider certifying capacity; no well restriction or hydrogeologic study, § 704.40(h)(1)

  • Closed-loop or recirculation systems encouraged only, not required or disclosed, § 704.40(o)

  • Sewage discharge only as approved by DEP or the Sewage Enforcement Officer; no wastewater plan, § 704.40(x)(4)

  • Air Pollution Control Act and federal hazardous air pollutant standards apply; Tier 4 generators only recommended, § 704.40(j)(3) and (s)

  • Intense heat must be imperceptible beyond lot lines; no thermal plan or disclosure, § 704.40(u)

  • Utility letters certifying capacity and Regional Transmission Organization certification of power; no electrical inspection, § 704.40(h)(1) and (l)(1).

  • Roof-mounted solar allowed but not required; no energy plan, § 704.40(k)

  • Accessory solar and wind addressed and diesel generators 500 ft from residential lots or districts, § 704.40(k) and (l)(2)

  • Landscaped buffer with optional earthen mound, reducible to 15 ft wide with a mound, § 704.40(d)(1)

  • Blank walls prohibited and a 20 ft by 5 ft recession or offset required every 200 ft of facade, § 704.40(b)(1)-(2).

  • Rooftop and ground equipment fully screened and placed to shield sound; no screening height, § 704.40(b)(3) and (j)(2)-(3).

  • Annual emergency training required but no emergency plan, § 704.40(m)(2)

  • Flammable materials stored under state and federal rules and outdoor fuel storage fenced; no disclosure, setbacks, or containment, § 704.40(w)-(x)

  • Firefighting water supply approved by the Fire Chief annually; no inspections, § 704.40(m)(3)

  • Financial security for traffic improvements only; no work hours, haul routes, or road damage bond, § 704.40(f)(3)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Conditional use in the Agricultural, Rural Residential/Industrial, and Residential/Commercial districts under a draft zoning ordinance

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data