North Lebanon Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for North Lebanon Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · North Lebanon Township
Would limit data centers to industrial-zoned land and require safeguards such as water and drought plans, landscaping buffers, and noise and vibration studies.North Lebanon Township proposed Ordinance 3-2026 regulating data centers

What this means

If enacted, the ordinance would restrict data centers to industrial land and impose substantial siting and review requirements, including a 20-acre minimum lot size, water studies, and noise and vibration studies (key requirements). These conditions would make some projects harder or costlier to build, though they would not ban data centers altogether.

People behind it

  • Unanimously agreed to advertise the data center ordinance for consideration and adoption. They agreed to advertise an ordinance regulating data centers.

Restrictions & requirementsHide restrictions & requirements8
  • The advertised ordinance would limit data centers to land zoned industrial. “limit data centers to industrial land”

  • It would subject data centers to aesthetic, dimensional, landscaping, screening, and noise/vibration requirements. “aesthetic, dimensional, landscaping, screening, and noise/vibration requirements”

  • Applicants would need to provide a water feasibility study. “a water feasibility study”

  • Applicants would need to provide a drought response plan. “a drought response plan”

  • A data center would need a lot of at least 20 acres. “minimum 20-acre lot size”

  • Building height would be capped at 45 feet, with up to 15 additional feet allowed for roof-mounted equipment. “maximum height of 45 feet plus up to 15 feet”

  • A landscape buffer of 100 feet or more would be required. “100 or more feet of landscape buffer”

  • Applicants would need to provide a sound and vibration study. “a sound and vibration study”

Benefits & exceptionsHide benefits & exceptions1
  • Designates the industrial zoning district for data centers, allowing the use on industrial land, subject to the ordinance’s requirements and the district’s general rules (“places the use in the industrial zoning district”).

Sources

pending · North Lebanon Township
The Board of Supervisors voted on October 19, 2026 to advertise the draft, and the township has posted a notice of a public hearing on November 16, 2026 at 7:15 p.m.North Lebanon Township, Lebanon County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements31
  • Section 27-1233.C.5 sets the 1,000 ft setback from R-1, R-2, and R-R properties and sensitive receptor lots for both data centers and data center accessory uses, which the Section 27-102 definition says include generators, substations, and cooling towers.

  • 45-ft height plus 15 ft of rooftop equipment, § 27-1233.C.2

  • Habitat and surface water review only within the water feasibility study; no buffer or environmental assessment

  • Section 27-1233.F.3 Table 1 sets 50 dB day, 45 dB evening, and 40 dB night LEQ at properties with homes and sensitive receptors, and Section 27-1233.F.2.f and F.5 require a log average of at least twenty one-minute intervals over 24 hours using a calibrated ANSI Type 1 or Type 2 integrating meter under ANSI S1 and S12 practice.

  • Pure tone limits by octave band and octave band analysis; no dBC limit, § 27-1233.F.3.e and F.7.b

  • Pre-construction study with the application and as-built study six months after occupancy; none at building permit, § 27-1233.F.7

  • Numeric ISO 2631-2 residential vibration limit with a vibration study; not a no-perceptible standard, § 27-1233.F.6-7.

  • Closed-loop cooling required; alternatives only if they use less water and energy, § 27-1233.G.2.

  • Section 27-1233.I.4 requires quarterly reports to the Township of daily withdrawals measured by a flow meter or recorder accurate to within 5 percent, and Section 27-1233.G.9 requires a drought response plan showing compliance with state, water supplier, and local drought declarations.

  • EPA Tier 4 diesel generators with annual testing reports, § 27-1233.M.10.a-b

  • Thermal Impact Mitigation Plan including waste heat reuse evaluation, § 27-1233.O.

  • Electronic Waste Plan for servers, batteries, and hazardous materials, with refrigerants in decommissioning, § 27-1233.P and Q.4.

  • Utility interconnection application, transmission security agreement, and energization date documented; no electrical inspection, § 27-1233.M.3.f

  • Energy Usage Plan and 10% PJM renewable procurement above 50 MW; rooftop solar listed as an effort, not required, § 27-1233.M.3-4

  • Substations at the side or rear and screened from public view, and on-site lines of 34.5 kV and below buried, § 27-1233.M.6-8

  • 100-ft planted landscape buffer next to residential districts and sensitive receptors, § 27-1233.D.1-3.

  • 10-ft facade offsets every 150 ft, 80 percent material and color limits, and articulated entrance, § 27-1233.B

  • Ground and rooftop equipment fully enclosed or fully screened; no 12-ft standard, § 27-1233.E

  • Elevations and renderings of visible facades required; no visual impact study, § 27-1233.B.6

  • Emergency response plan accepted by the fire department, 24-hour contact signs, and radio coverage; no annual updates, § 27-1233.N.1-3

  • Plan must ensure first responder training; cost not assigned, § 27-1233.N.1.e

  • Hazardous waste disposal procedures only; no disclosure, storage setbacks, or spill containment, § 27-1233.N.5

  • Annual fire safety inspections; no third-party electrical inspection, § 27-1233.N.1.f

  • Construction noise limited to daytime hours; no haul routes or road bond, § 27-1233.F.4.f

  • Plan, closure notice, and bond equal to 100% of cost; removal within 18 months, not 6, § 27-1233.Q

  • Bond amount updated annually, § 27-1233.Q.5

  • Quarterly water withdrawal and groundwater reports, § 27-1233.I.4

  • Draw on well security and equity action; noise violation is an ordinance violation; no specific penalties or revocation, § 27-1233.F.7.c and K

  • Plans subject to municipal and engineer review; cost not assigned, § 27-1233.M.3.g and O.7

  • Applicant public meeting before Planning Commission review and a project website kept current through final land development approval, § 27-1233.R

  • Operator defined but not required to be named, § 27-102

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I-1 Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data