North Fayette Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for North Fayette Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · North Fayette TownshipThe text is the unsigned draft released through a Right-to-Know request on November 2, 2026, after the Board of Supervisors agenda for October 20, 2026 listed a public hearing on it; no adoption vote had been posted as of November 2, 2026, and no date for one was found.North Fayette Township, Allegheny County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements31
Conditional use under Part 6, Art. III; no lapse of approval stated
Parcels registered as Preserved Farmland or in an Agricultural Security Area may not contain a data center, Art. VI(4); no prime soils standard
Underlying district height limit; rooftop equipment screened but not counted in height, § 27-637A(2) and A(3)(b)
PNDI natural resource and habitat inventory; water impact study for water-cooled centers, § 27-637D(2) and B(4)(b)(3)
65 dBA day and 55 dBA night at property lines, 55 dBA at lines adjoining homes, ANSI S1.4 meters, § 27-637B(1)(a)(2)(1); day limit above 50 dBA
Sound study must address low-frequency noise; no dBC limit, § 27-637B(1)(a)(2)(2)
Preliminary study with conditional use application and as-built study 6 months after occupancy; full operating load not stated, § 27-637B(1)(a)(2)(1) and (4)
Generator testing 9:00 a.m. to 3:00 p.m. Monday through Friday, no more than 2 hours per day, § 27-637B(4)(a)(3)(4)
Public water required and well water barred, with a will-serve letter, § 27-637B(4)(b)(1), (2), and (6)
Closed loop systems and water conservation required; evaporative cooling not limited, § 27-637B(4)(b)(4)
Annual water usage reports; metering not stated and drought measures not tied to declarations, § 27-637B(4)(b)(5) and (7)
Cooling and industrial wastewater disposal must be approved by DEP and the sewage authority, § 27-637B(4)(b)(9)
E-Waste Management Plan and hazardous materials plan covering on-site storage of batteries and coolants; no disposal contract, § 27-637B(4)(g)
Roof-mounted solar at the maximum allowance required; no energy plan stating demand, § 27-637B(4)(a)(5)
Independent power generation is a separate use with its own approval; equal noise and emission standards not stated, § 27-637B(4)(a)(1)
Accessory structures, including substations, screened from public view; on-site lines not buried, § 27-637A(3)(b)
Battery storage is a separate use and must meet NFPA 855 with battery-specific suppression, § 27-637B(4)(a)(4) and B(4)(c)(2)
Utility certification addresses rate impacts and applicant identifies infrastructure improvements and contributions; upgrade cost and tariff terms not required, § 27-637B(4)(a)(2) and D(5)
50-ft buffer with dense evergreen and deciduous screen next to residential districts, § 27-637A(3)(a)
Facade variation, defined entrances, and 100-ft wall length limit without treatment, § 27-637A(2)(c)
Screening of 12 ft for ground and 10 ft for roof components from public view, and noise equipment enclosed, § 27-637A(3)(b) and B(1)(b)
Emergency response plan approved by the Township Emergency Management Coordinator with annual drills; no annual plan update or 24-hour contacts, § 27-637B(4)(e)
Hazardous materials management plan with on-site storage, SDS to responders, and spill control; no storage setbacks, § 27-637B(4)(c)(6) and B(4)(g)
Community impact analysis must evaluate traffic impacts with a traffic impact study for every application; construction traffic and route extent not stated, § 27-637D(9)(d)
Adequate second means of emergency access required, § 27-637A(4)(a)(2)
Decommissioning plan and 110% bond or escrow less salvage value; no removal deadlines, § 27-637C(1)-(3)
Plan and security reviewed and adjusted every 2 years, § 27-637C(1)-(2)
Annual water usage reports required, with annual noise and vibration reports on request, § 27-637B(4)(b)(7), B(1)(a)(2)(4), and B(2)(b)
Penalties under § 27-1508 plus added mitigation or operating limits; no revocation grounds, § 27-637E
Township may have sound studies prepared by a consultant it selects at developer expense; not tied to review of all studies, § 27-637B(1)(a)(2)(4)
Application must name the property owner, developer, data center operator, and end user, § 27-637D(7)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed conditional use in a Data Center Overlay District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data