North Cornwall Township
Anti-Data Center Policies
North Cornwall Township’s enacted ordinance limits noise and building height and requires sound testing and setbacks from homes and other protected places, increasing costs while still allowing data centers to be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · North Cornwall TownshipThe data center definition and Section 402.19 were added to the zoning ordinance (Ordinance No. 295) by Ordinance No. 338, which the supervisors enacted on December 16, 2025 after a public hearing.North Cornwall Township, Lebanon County — data-center ordinance (No. 295 As Amended By No. 338)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements23
Conditional use decided by the Supervisors after a hearing, with approval lapsing if land development is not filed within 12 months, § 401 and § 401.G
67 dBA day, 57 dBA night at property line, § 402.19.I.1
Preliminary, interim and as-built sound studies using ANSI S1.4 meters; the as-built study is not tied to full operating load, § 402.19.I.1
Only generator noise must be evaluated, § 402.19.I.2
Vibration study showing no vibration perceptible beyond the property line; no numeric limit, § 402.19.I.3
Water feasibility study if not on public water, § 402.19.J.2
Cooling method not required to be disclosed
Projected water demand disclosed and SRBC approval, § 402.19.J.2 to J.3
Disposal of domestic and cooling or industrial wastewater must be shown as provided and approved by the Sewage Enforcement Officer or DEP, § 402.19.J.4
Electric provider certification of available capacity and service required with the application, § 402.19.K.1
Generation supplying normal operations is a separate use approved under its own zoning rules; equal noise and emission standards not stated, § 402.19.K.2
NFPA 855 compliance with battery-specific fire suppression; no battery setbacks or hazard mitigation analysis, § 402.19.L.2
Known rate impacts must be noted, § 402.19.K.1
300-ft landscape strip along all property lines; no year-round screening or plant replacement standard, § 402.19.E
Must comply with § 308 lighting (shielded, 0.1 fc at residential lines), § 402.19.B
Emergency plan accepted by fire department, § 402.19.L.1
First responders must receive training, no funding, § 402.19.L.1.d
Annual fire safety inspections, § 402.19.L.1.e
Qualified traffic impact report under the SALDO in every case; construction traffic and study area not stated, § 402.19.A
Access roads evaluated in plan only, § 402.19.L.1.c
Definition includes cryptocurrency mining, blockchain processing and server farms and excludes incidental servers without a size limit; artificial intelligence not named, § 113 as amended by Ordinance No. 338
One as-built sound study after opening, § 402.19.I.1.c
As-built noise exceedance is a violation of the ordinance, § 402.19.I.1.c
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial Zone
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data