North Centre Township
Anti-Data Center Policies
North Centre Township’s enacted ordinance requires data centers to keep setbacks from homes and other protected places, increasing construction and review costs, but still allows approval.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · North Centre TownshipThe current rules are in the North Centre Township Zoning Ordinance of 2026, which was adopted on July 15, 2026, and the Planning Commission scheduled a special meeting for October 29, 2026 to review a proposed re-enactment of the entire zoning ordinance that includes revisions to the data center provisions in § 27-456.North Centre Township, Columbia County — data-center ordinance (Zoning Ordinance Of 2026)
What this means
The measure imposes setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements22
Conditional use in the DCTO and I districts, § 27-309 and § 27-311; no approval expiration found
300-ft setback on all sides, § 27-456.2.e
300-ft setback on all sides protects all neighboring uses at less than 1,000 ft, § 27-456.2.e
Lesser of 3 stories or 40 ft, with generators kept below the roof line; no rooftop equipment limit, § 27-311 and § 27-456.2.f
Full impact assessment with environmental compatibility report and hydrogeological study; no riparian buffer, § 27-456.4
Single 55 dBA property line limit, § 27-456.2.f
Noise protocol with projected day and night levels before approval; no later study, § 27-456.4.a.iv
Vibration isolation required for mechanical systems; no study or property line standard, § 27-456.2.f and 4.a.iv
Hydrogeological drawdown study where wells or recharge areas are affected; no pump tests or bar on wells, § 27-456.4.a.iii
Closed-loop, hybrid, or reclaimed-water cooling; open-loop prohibited, but hybrid systems allowed, § 27-456.2.g
Stamped water use plan with daily and peak withdrawals; no cap or reporting, § 27-456.2.g and 4.a.ii
Utility coordination plan with substation capacity and redundant service confirmation; no electrical inspection, § 27-456.2.a and 4.a.ii
Electrical demand, peak and base load documented; no on-site renewable requirement, § 27-456.4.a.ii
Energy generating facilities listed as a separate conditional use in the DCTO; no separate setbacks, § 27-311
Required utility upgrades must be identified; cost not assigned, § 27-456.4.a.ii
Section 27-456 subsection e requires a 300 ft minimum setback and a 200 ft minimum buffer of native evergreens, berms, opaque fencing, and a gravel firebreak, with effective layering for noise and visual impact, but it does not require replacement of dead or diseased plants.
Long facades must include articulation, step-backs, or landscaping, § 27-456.2.e
Opaque fencing, acoustic shielding, and baffled generator enclosures; no screening height, § 27-456.2.e and f
Fire protection and emergency operations plan with site maps for emergency services; no fire company review or annual updates, § 27-456.4.a.i
Traffic analysis in the full impact assessment for sites over 5,000 sq ft or 1 MW, § 27-456.3 and 4.a.vii
Two ingress and egress points and no reliance on residential streets; no arterial requirement, § 27-456.2.c
Removal and restoration within 180 days of notice with bonding of unspecified amount, § 27-456.2.j
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the DCTO Data Center and Technology Overlay, with minor data centers also in the I Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data