Borough of Norristown
Anti-Data Center Policies
Norristown Borough’s enacted ordinance requires setbacks from protected places, minimum site sizes, and cooling and water-use limits. Data centers can still seek approval, but these rules narrow where and how they can operate.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Norristown BoroughThe rules are in Ordinance No. 26-04, which Municipal Council adopted unanimously on August 18, 2026, and in August 2026 Norristown also applied for party status in the Plymouth Township hearing on a proposed data center.Norristown Borough, Montgomery County — data-center ordinance (No. 26-04)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements30
45 ft including rooftop appurtenances and rooftop accessory uses, equal to the 45-ft HI district limit for all uses, § 320-161.E(1)(b)[2] and Article XVI dimensional table
Water feasibility study for nonpublic sources only; no riparian buffer or environmental impact assessment
40 dBA night (7:00 PM to 7:00 AM) and 45 dBA day at the property line; no stated measurement method, § 320-161.E(1)(i)[1]-[2]
50 dBC night and 60 dBC day at the property line, § 320-161.E(1)(i)[2](a)
Pre-construction study with octave-band analysis and post-construction study 1 to 12 months after the first certificate of occupancy; full operating load and measurement method not stated, § 320-161.E(1)(i)[1]
Baseline vibration levels in the pre-construction study only; no vibration standard, § 320-161.E(1)(i)[1](a)
Closed-loop cooling required unless an alternative is shown to use less water and energy, Water Usage [2]
Drought response plan required; no metered use reporting, Water Usage [6]
Wastewater analysis including HVAC discharge with public authority certification of capacity, and no approvals until required DEP, SRBC, or DRBC permits are obtained, Water Usage [5], [7]
Untreated wastewater barred from stormwater systems only; no stormwater standard for data centers, Water Usage [7](b)
Diesel generators must meet EPA Tier 4, with annual testing and emissions reports to the municipality, § 320-161.E(1)(f)[1]-[2] and Air Pollution [2]
Thermal Impact Mitigation Plan evaluating off-site thermal impacts under seasonal conditions and waste heat reuse, § 320-161.E(1)(h)
Electronic Waste Plan for servers, hazardous materials, and batteries; refrigerants and a disposal contract not required, Electronic Waste [1]
Energy Usage Plan documents the utility application and transmission security agreement status; executed agreement not required before the zoning permit, § 320-161.E(1)(d)[1](f)
Energy Usage Plan with annual demand, and 10% renewable procurement above 50 MW; rooftop solar is an effort to document, not a set share, and peak demand by phase not required, § 320-161.E(1)(d)
Energy generation for normal operation is a separate principal use with its own approval, with data center buildings placed between it and homes, § 320-161.E(1)(e)[1]-[2]
On-site substations to the side or rear and screened from public view, and on-site lines of 34.5 kV and below buried, § 320-161.E(1)(e)[3]-[5]
NFPA 855 with battery-specific fire suppression; no setbacks, fire test data, or hazard mitigation analysis, § 320-161.E(1)(k)[4]
Applicant funds required public utility upgrades unless the utility certifies none are needed; cost and tariff terms not disclosed, § 320-161.E(1)(p)
Facade offsets every 150 ft, 80% limits on one material and one color, 60% articulation, and an articulated entrance, § 320-161.E(1)(c)[1]-[5]
Roof equipment set back from the parapet by its height and substations screened; ground equipment screening and sound walls not addressed, § 320-161.E(1)(c)[6] and (e)[3]-[4]
Elevations and renderings of facades visible from off-site required; no visual impact study, § 320-161.E(1)(c)[7]
Emergency Response Plan acceptable to the fire department and EMS, with 24-hour contact signage and radio coverage; no annual update or walk-through, § 320-161.E(1)(k)[1]-[3]
Hazardous material disposal in the waste and decommissioning plans only; no storage setbacks or containment
Annual fire safety inspections by a qualified professional; no report to the fire official or correction period, § 320-161.E(1)(k)[1](e)
Security of net decommissioning cost plus 10% before the construction permit and an agreement that may be recorded; removal begins within 1 year and ends within 18 months, § 320-161.E(1)(n)[3]-[5]
Definition includes cryptocurrency mining and blockchain processing but not artificial intelligence; incidental equipment exempt without a size or power limit, § 320-11
One post-construction noise study; annual reports cover generator testing and emissions only, § 320-161.E(1)(f)[2] and (i)[1](b)
Municipality may require supplemental plans, and the applicant pays review costs for decommissioning estimates only, § 320-161.E(1)(d)[1](g) and (n)[5](e)
Public meeting 14 days before the first conditional use hearing and a project website through final land development approval; meeting not tied to planning commission review, § 320-161.E(1)(o)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the HI Heavy Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data