Nockamixon Township
Anti-Data Center Policies
Nockamixon Township’s enacted ordinance requires technical studies, utility checks, noise limits, and sound testing for data centers, increasing review and compliance costs while still allowing approval.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Nockamixon TownshipThe rules are in Ordinance No. 175, which the Board of Supervisors enacted on June 18, 2026.Nockamixon Township, Bucks County — data-center ordinance (No. 175)
What this means
The measure imposes technical studies and utility checks and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements10
Conditional use; no approval expiration, use table and § 234-23(X)
Refers to Section 140-9, which sets no numeric decibel limit, § 234-23(X)(3)(c) and § 140-9
Coolant composition and safety profile must be disclosed, § 234-23(X)(3)(j)[2]
Licensed electronic waste recycling firm must be named, § 234-23(X)(3)(a)
Written utility verification of capacity required; no third-party inspection, § 234-23(X)(3)(g)[3].
Grid capacity and rate impacts disclosed; power bill financial security, § 234-23(X)(3)(g)[4] and (p)[2]
Seven-foot fence only; no equipment screening, § 234-23(X)(3)(i)
Emergency management plan required, § 234-23(X)(3)(g)[1]
Financial security equal to estimated removal cost; no 110 percent, notice, or deadline, § 234-23(X)(3)(p)[1]
Developer, operator, and end user not required
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial District