Borough of New Stanton
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Borough of New Stanton.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · New Stanton BoroughThe draft has no ordinance number and has not been adopted, and the October 6, 2026 council agenda listed a public hearing for November 17, 2026, while the newspaper notice proof the borough provided gives a hearing date of October 20, 2026 with run dates of October 28 and November 4, 2026.New Stanton Borough, Westmoreland County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements13
Allowed only in LI-1, with a 200-ft setback from the RA Residential Agricultural District; no preserved farmland or agricultural security area bar, § 27-515(1) and (3)(c)
75 dBA from 7:00 a.m. to 10:00 p.m. and 70 dBA at night, above 50 and 45 dBA, § 27-515(6)
Water feasibility study where nonpublic sources are used; no well ban or pump tests, § 27-515(7)(b)
Water use for cooling disclosed only for nonpublic sources; no cooling method disclosure, § 27-515(7)(b)(iii)
Projected water demand disclosed for nonpublic sources, § 27-515(7)(b)(i)
Section 27-515(7)(c) requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer, public authority, or Pennsylvania DEP, as a conditional use standard.
Utility certification that capacity is available; no third-party electrical inspection, § 27-515(8)(a).
Known impacts on electric rates or availability for other users must be noted, § 27-515(8)(a)
Landscape buffer under § 27-513; width not stated, § 27-515(4)
Equipment within 200 ft of roads, residential districts, or sensitive receptors fully enclosed or screened, § 27-515(5)(a)
Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or 24-hour contacts, § 27-515(9)(a)
Applicant must ensure first responders receive system-specific training; cost not assigned, § 27-515(9)(a)(iv)
Annual fire safety inspections, § 27-515(9)(a)(v)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the LI-1 Light Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data