New Britain Township

Anti-Data Center Policies

New Britain Township’s enacted measure gives local officials a protected period to address zoning gaps, potentially delaying developers’ challenges; it does not ban every data-center project.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · New Britain Township
The Board of Supervisors adopted Resolution 2026-08 initiating the curative amendment process by a 5-0 vote.New Britain Township, Bucks County — data-center resolution 2026-08

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

pending · New Britain Township
The unnumbered draft amending Chapter 27, Zoning, appeared in the October 13, 2026 Planning Commission packet, the Planning Commission recommended it for advertisement, and it goes next to the Environmental Advisory Council and then to the Board of Supervisors, which has until January 11, 2027 to enact a curative amendment.New Britain Township, Bucks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements33
  • Conditional use in the I Industrial District only, not permitted in any other district, § 27-306 and § 27-1701.c.

  • Schools, day care centers, parks, and other sensitive receptors get the 200-ft yards and an 800-ft substation setback; hospitals not named, § 27-305.K22.d and .k(4)(iv)

  • Section 27-305.K22.e(1) limits a data center to 35 ft inclusive of roof-mounted cooling, ventilation, and HVAC equipment, and Section 27-1702.B.1 limits every other use in the I Industrial District to 35 ft (October 13, 2026 Planning Commission packet).

  • Phasing allowed, with an individual site plan approved for each data center before permits; no new conditional use for added capacity, § 27-305.K22.u-v

  • 55 dBA day and 45 dBA night Leq at residential property lines, § 27-305.K22.g(13)

  • Section 27-305.K22.g(18), Table 6, treats an increase of 3 dBA or more above the baseline ambient level documented before construction as a violation, but the baseline is not defined as L90 and no floor is set below which the cap does not apply.

  • 70 dBC day and 60 dBC night at the nearest property line, § 27-305.K22.g(15)

  • Pre-construction study with the conditional use application and as-built study within 180 days of operation; none at building permit, § 27-305.K22.g(1) and (3)

  • Testing allowed with 24-hour public notice; no time-of-day limit or hours cap, § 27-305.K22.k(5)

  • 65 VdB human perception and PPV damage limits in pre- and post-construction studies; not a no-perceptible standard, § 27-305.K22.g(4)

  • Public water required and no primary cooling make-up water from private potable wells, with a water consumption assessment; no pump test, § 27-305.K22.j(2)-(3) and .r(3)

  • Closed-loop cooling required and open evaporative cooling towers prohibited without a Board exemption, § 27-305.K22.r(1)-(2).

  • Projected water consumption assessed; no use cap, reporting, or drought plan, § 27-305.K22.j(3)

  • NPDES coverage for cooling tower blowdown and other discharges required before conditional use approval, or a sworn no-discharge statement, § 27-305.K22.s

  • NPDES and erosion and sediment control permits submitted before township permits; no added stormwater standards, § 27-305.K22.v

  • Only Tier IV generators allowed and Air Pollution Control Act standards apply; no annual emissions testing or reports, § 27-305.K22.k(5) and .p(1)

  • Heat-producing operations must be imperceptible beyond the lot lines; no thermal impact plan, § 27-305.K22.p(3)

  • Decommissioning plan covers removal of electronic waste and hazardous materials; batteries and refrigerants not named, § 27-305.K22.p(5)

  • Utility certification of capacity with the conditional use application; no third-party electrical inspection, § 27-305.K22.k(1).

  • Assessment of electrical consumption and utility coordination on self-sufficiency; no required on-site renewables, § 27-305.K22.j(3) and .k(3)

  • Generation supplying normal operations is a separate principal use with its own approvals and zoning rules, plus a Fire Marshal safety plan, § 27-305.K22.k(4)(i) and .t.

  • Substations at the side or rear and screened, with 800-ft or 200-ft setbacks; lines from substations buried unless the utility requires otherwise, § 27-305.K22.k(4)(ii)-(iv) and .l

  • 75-ft landscape buffer along all property lines and road rights-of-way, § 27-305.K22.f(1)

  • 6-ft security fence, dense buffer screening, and screened substations; no equipment screening height or acoustic screening, § 27-305.K22.f(2), .f(10), and .k(4)(ii)-(iii)

  • Emergency Response Plan reviewed and approved by the fire department; no annual plan updates, radio coverage, or posted contacts, § 27-305.K22.n(1)

  • Hazardous materials removal addressed in the decommissioning plan; no storage setbacks or spill containment, § 27-305.K22.p(5)

  • Annual fire safety inspections and annual Fire Marshal inspection of on-site generation; no third-party electrical inspection, § 27-305.K22.n(1)(v) and .t

  • Second means of emergency ingress and egress approved by the Fire Marshal; no road classification requirement, § 27-305.K22.m

  • Financial security at the estimated cost, 48-hour notice of cessation, removal within 12 months or 6 months after township notice; not 110%, § 27-305.K22.p(5)-(6)

  • Periodic adjustment of security may be required; no set update schedule, § 27-305.K22.p(6)(vi)

  • One as-built noise and vibration study within 180 days of operation, § 27-305.K22.g(3)

  • Noise corrective action within 30 days and remediation within 90 days, interim curtailment, and decommissioning failure treated as a violation; no penalties or revocation, § 27-305.K22.g(7), (11) and .p(5)(viii)

  • Section 27-305.K22.p(6)(iv) lets the Township retain a professional to review the decommissioning cost estimate at the applicant's expense, but the estimate is part of the decommissioning plan submitted with the conditional use application, and no applicant-paid review of the other studies in land development review is stated.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data