Nescopeck Township

Anti-Data Center Policies

Nescopeck Township’s enacted ordinance limits data-center locations through setbacks from homes and other protected places, minimum site sizes, and restricted eligible areas. Approval remains possible, but these limits narrow where projects can be built.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Nescopeck Township
The current rules are in Ordinance No. 25-3, which the Board of Supervisors adopted on December 11, 2025.Nescopeck Township, Luzerne County — data-center ordinance (No. 25-3)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements23
  • Height deferred to Section 404 with no figure stated in the amendment

  • 67 dBA day and 57 dBA night at neighboring property lines, Section 811.8

  • Octave-band limits including 72 dB below 75 Hz; no dBC limit, Section 811.15.D

  • Study with land development and as-built study after opening; none at building permit, Sections 811.8 and 811.15

  • Generator testing limited to daytime hours; no weekday rule or hours cap, Section 811.4

  • Vibration study showing none past the property line, Section 811.12.

  • Water supply feasibility study, Section 811.10

  • Water usage must be shown with utility needs, Section 811.13

  • Section 811.11 requires the applicant to demonstrate that adequate means of wastewater disposal, including wastewater used for cooling or industrial purposes, have been provided for and approved by the Sewage Enforcement Officer and/or PA DEP.

  • Tier IV diesel generators and state emission rules; no annual testing, Sections 811.2.D and 811.16

  • Utility evidence that service is feasible and approved with the land development application; no electrical inspection, Section 811.3.G.

  • Electrical load and power supply plan required, Sections 811.13 and 811.14.B

  • Substations set back 300 ft and all new lines underground; substations not screened or placed to the side or rear, Sections 811.1.D and 811.14.A

  • Needed substation and infrastructure expansion must be disclosed, Section 811.14.B

  • Dense planted buffer yard within the setback; width not stated, Section 811.6.B

  • Section 811.5.A requires principal building facades to avoid undifferentiated surfaces with at least two design elements, such as step-backs, fenestration, or a change in material, pattern, texture, or color, every 150 horizontal feet, and Section 811.5.C requires fenestration of at least 30 percent of the principal facade.

  • Ground and rooftop equipment screened with noise-absorbing screens; no 12-ft height, Section 811.6.A

  • Emergency response plan approved by the fire department; no annual update, radio, or contacts, Section 811.18

  • Plan must ensure responder training; no funding, Section 811.18.L

  • Fuel storage must meet fire codes only, Section 811.2

  • Annual fire safety inspections, Section 811.18.M

  • Section 811.7 requires a traffic impact study with every land development application, addressing daily operational traffic and emergency response access, but it does not cover construction traffic or reach the nearest arterial or interchange.

  • Continuous noise monitoring transmitted to a public online database where next to homes, Section 811.4.E

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data