Anti-Data Center Policies

Muncy Township’s enacted measures provide time to address zoning gaps and pause covered data-center applications or development for nine months. They may delay affected projects but do not permanently ban all data centers.

Incentives

Financial Incentive
4

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Muncy Township
The Supervisors adopted Resolution No. 2026-09, declaring the zoning ordinance substantially invalid as it relates to data centers and initiating a curative amendment under Section 609.2 of the Municipalities Planning Code.Muncy Township, Lycoming County — data-center resolution 2026-09
current law · Muncy Township
The Supervisors passed Resolution 2026-05, directing the Planning Commission to prepare a curative amendment; the posted copy is undated, and the January 4, 2027 deadline comes from the draft ordinance.Muncy Township, Lycoming County — data-center resolution 2026-05

current law · Muncy Township
At a special meeting the Supervisors adopted Resolution 2026-02, a moratorium on data centers and similar high-intensity data processing facilities for nine months or until data center zoning rules are adopted.Muncy Township, Lycoming County — data-center resolution 2026-02

What this means

The measure pauses covered data-center applications or development for nine months. That stops affected projects from moving ahead during the pause, even though it is not a permanent ban.

Timing

At a special meeting the Supervisors adopted Resolution 2026-02, a moratorium on data centers and similar high-intensity data processing facilities for nine months or until data center zoning rules are adopted.

Sources

pending · Muncy Township
Draft Ordinance No. 2026-1 has not been adopted, a public hearing is scheduled for November 4, 2026, Resolution 2026-09 of July 8, 2026 declared the zoning invalid for data centers, and the draft ordinance gives a January 4, 2027 deadline for adoption, while appeals of the deemed approval of the Danko Holdings and Fishlips campus remain pending.Muncy Township, Lycoming County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements31
  • 250 ft setback from streams and wetlands, 50% woodland disturbance cap, and environmental impact statement; no steep slope widening, §§ 4(f), 5.3, 11.1

  • Material physical modification requires a new application, stated for data centers built before the effective date, § 1.3(b)

  • 50 dBA daytime and 45 dBA evening at suburban receiving properties; the nighttime column is missing from Table 1, § 6.1(b)

  • Baseline ambient study required, but no cap above background, § 6.3(c)

  • Pure tone limits by frequency from 16 Hz; no dBC limit, § 6.1(e)

  • Modeling study with the application and as-built study six months after occupancy; no building permit study, § 6.3(a)-(b)

  • Section 6.1(h) limits generator testing to 9:00 AM to 5:00 PM, Monday through Friday, for up to one cumulative hour per seven days, with no allowance for longer tests required by code.

  • Private wells barred for cooling, cooling water from rivers or streams only, and hydrogeologic report with step, 72-hour constant-rate, and recovery tests, §§ 7.2, 7.5(d).

  • Closed-loop cooling required unless the Board grants an engineering-based exemption, § 7.4.

  • Quarterly reports of daily withdrawals; no drought response plan, § 8.1(a)

  • Feasibility study describes discharge means and temperature, § 7.5(c)

  • Must meet 25 Pa. Code Chapters 123 and 131 and DEP rules; no Tier 4 standard, § 6.4(a)

  • Heat and humidity may not be perceptible beyond the property line; thermal studies for quarry cooling water, §§ 6.4(a), 7.4

  • E-waste plan for computers, servers, batteries, and hazardous substances; refrigerants not named, § 12.1

  • Utility certification of capacity with the conditional use application; no third-party inspection, § 9.1.

  • Projected average and peak power use reported; no on-site renewable requirement, § 9.1

  • Section 9.1 requires a utility capacity certification and an estimate of the impact on electric rates or availability, and requires the applicant to pay added loading or transmission costs, but the required grid upgrades are not identified or disclosed.

  • 100 ft landscape buffer along all property lines, § 5.1(a).

  • Ground and roof equipment fully enclosed or screened; no acoustic or 12 ft standard, § 5.4

  • Emergency plan accepted by the fire department, radio coverage, and 24-hour contact signs; no annual plan update, §§ 10.1-10.2

  • Section 10.1(c) requires the applicant, before the certificate of occupancy and every year after, to fund specialized training and needed equipment for the Township fire department, but the applicant does not deliver the training itself or keep the equipment on site.

  • Written procedures for hazardous substances; no storage setbacks or containment, § 12.1

  • Annual fire safety inspections at the operator's cost; no third-party electrical inspection, § 10.1(e)

  • Section 11.2 requires a traffic impact analysis covering construction and operation for roadways, intersections, bridges, and interchanges within one-half mile of the site.

  • Construction traffic studied, but no work hours, haul routes, or road bond set, § 11.2

  • Security for full cost (minimum $50,000), removal starting within one year and finished within 18 months; not 110%, § 12.2-12.3

  • Security adjusted every fifth year; no first-year update, § 12.3(b)

  • Quarterly water withdrawal and groundwater reports, § 8.1(a)

  • Section 12.4 requires an escrow with the conditional use submission to cover independent third-party review, and Section 6.3(c) allows third-party verification of studies at the applicant's expense, but the review is tied to the conditional use rather than land development review.

  • Generator tests announced online, but no community meeting or project website, § 6.1(h)

  • Ownership transfer notice only; developer, operator, and end user not required, § 1.3(c)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data