Morris Township
Anti-Data Center Policies
Morris Township’s enacted ordinance requires setbacks from homes and other protected places, minimum site sizes, and cooling and water-use limits, substantially narrowing workable sites and project designs despite an available approval route.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Morris TownshipThe Board of Supervisors adopted Ordinance No. 2026-3 on September 8, 2026, as certified by the township secretary, and the ordinance took effect on enactment.Morris Township, Clearfield County — data-center ordinance (No. 2026-3)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements31
Board of Supervisors approval after Planning Commission review; no hearing or expiration stated, Section 3.1
Section 4.B requires all buildings, cooling systems, accessory facilities, and accessory structures to be at least 3,000 feet from existing dwellings and residential subdivisions, and backup generators and fuel tanks at least 3,000 feet from any dwelling.
Expansion over 10% of building area, power, water, cooling, or battery capacity requires new Board approval, Section 4.B.
Section 4.D(2) sets 45 dBA at night and 40 dBA at other times at residential property lines, but no measurement metric or procedure is stated for these limits; the ANSI method and Type I meter in Section 2 apply only to establishing the ambient level.
60 dBC at night only, Section 4.D(2)
Pre-construction study and as-built study within six months; no building permit study, Section 4.D(1) and (3)
Hydrogeologic study before approval and once-through well cooling barred; no pump test, Sections 4.C and 4.E
Section 4.C requires a closed-loop or equivalent closed recirculating cooling system, bars once-through systems, and allows no net consumptive impact, but it does not expressly bar evaporative systems or limit them to a stated water-use rate shown to meet the noise limits.
Quarterly and annual water consumption reporting; no drought plan, Sections 4.C and 4.D(6)
Once-through discharge barred; no cooling discharge plan, Section 4.C
Stormwater management plan required, Section 4.H
Section 5.D bars heat discharge that creates measurable adverse impacts off site and requires a waste heat recovery and reuse evaluation submitted to the Township, but it does not require property line temperature effects to be modeled.
Documentation of lawful recycling or disposal of servers, batteries, and cooling equipment on request; no plan, Section 4.H
Written utility confirmation required; no third-party electrical inspection, Section 5.
Utility capacity impact study and energy consumption assessment, Sections 4.H and 5
Generators limited to emergency use and testing, Section 5.B
NFPA 855 with battery-specific fire suppression, plus a 5,000-ft battery setback, Sections 4.I(6) and 6.
Utility must confirm no ratepayer-funded improvements or rate increases, Sections 4.F and 5.
Landscaped or forested buffer next to residential areas; no width, Section 4.1
Mechanical equipment, including generators, enclosed or screened, Section 4.1
ERP accepted by the fire department; fuel site plans and emergency contacts updated annually, Sections 4.I and 7.G
Applicant reimburses training, planning, and equipment costs of fire and emergency services, Section 4.I(8).
Section 7 keeps fuel storage at least 200 feet from streams, wetlands, and water supply wells, requires secondary containment of 110% of the largest tank, and requires an SPCC Plan submitted to the Township before any permit, while Section 4.B keeps accessory structures 2,000 feet from property lines and fuel tanks 3,000 feet from dwellings.
Annual fire safety inspections; no third-party electrical inspection, Section 4.I(5)
Traffic considered only in the environmental assessment; no traffic study, Section 4.H
Road maintenance agreement with surveys and financial security; no work hours or haul routes, Section 4.3
Bond for the full cost; removal within 18 months, Section 8
Bond adjusted every 5 years; no first-year update, Section 8.2
Annual reports on water, electricity, generator hours, and noise monitoring, Section 4.D(6)
Section 9 provides permit revocation or operational suspension for failure to remediate and civil fines up to $1,000 per day, but no notice or hearing is required before revocation.
Section 8.3 requires an application escrow and lets the Township retain engineers, acoustical consultants, and other professionals to review the application at the applicant's expense, but the review is tied to the Board of Supervisors approval, not land development review.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data