Moon Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Moon Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Moon TownshipThe revised draft was posted in the October 19, 2026 Planning Commission packet for a presentation, and the data center ordinance is listed on the October 28, 2026 Board of Supervisors workshop agenda, with no public hearing advertised in the posted agendas.Moon Township, Allegheny County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose technical studies and utility checks, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements32
Hyperscale tier limited to M-1 (mid-scale M-1, MX, RT; edge M-1, BP, MX, RT), draft Section 2 Use Table
Hyperscale primary structure 110 ft and accessory 25 ft (mid-scale 85 ft, edge 75 ft); no rooftop equipment limit, Section 4 dimensional table
Narrative of environmental impacts with mitigation measures and DEP submissions required; no riparian buffer, Section 4S(l)
Master Site Plan, a site plan review application with load analysis before each later phase, and new zoning review when capacity passes a tier threshold, Section 4L(iv) and S(c)(i)(3)-(4).
65 dBA day and 55 dBA night at property lines, 55 dBA next to homes; Table 1 sets 60 dBA day and 50 dBA night at residential receiving lots, Section 4G and amended 27-404
Amended Section 27-404(1)C(3)(c) allows no more than 10 dB above the surrounding ambient noise level, with Type 1 meter procedures in Section 27-404(1)C(3)(b), but the ambient is not an L90 measure and no floor is set below which the cap does not apply.
60 dBC day and 50 dBC night at residential receiving lots (65 and 60 dBC at commercial and industrial), amended 27-404 Table 1
Preliminary study with the application, pre-construction study with the site plan, and as-built studies after occupancy; none at building permit, Section 4G and 27-404(1)C(3)(e)-(f)
Testing capped at 2 hours per day and limited to 8:00 a.m. to 4:30 p.m.; not limited to weekdays, Section 4I and 27-404(1)C(3)(d)(iii)
Vibration study, none perceptible past the property line, third-party verification before occupancy, Section 4H and amended 27-405.
Third-party water impact study required and private wells barred unless the study shows feasibility, with neighbor well tests; no pump test, Section 4M
Projected water usage forecast and five-year post-development analysis; no cap or drought plan, Section 4L(vi) and M(ii)
Section 4D requires the applicant to show that disposal of domestic and cooling or industrial wastewater has been provided and approved by the Moon Township Municipal Authority or PA DEP, but it does not state that the approval must be in hand before the zoning permit.
Erosion and sedimentation and post-construction stormwater plans required as applicable, Section 4S(l) and (n)
Disposal of materials must meet state and federal rules, with hazardous materials removal plans; no electronic waste plan, Section 4P and R(iii)
Utility letters for all required utilities and a third-party Energy Impact Study of grid capacity; no electrical inspection before occupancy, Section 4C and L(iii).
Energy Impact Study and power source demonstration; no on-site renewable requirement, Section 4L(ii)-(iii)
Section 4L(v) treats on-site generation for normal operation as a separate use approved under its own regulations, and Section 2 makes an Electric Generating Plant a conditional use, but the plant's noise and vibration subsections are left blank and no emission standards are stated.
Substations counted as data center accessory uses and listed as a separate conditional use; no screening, placement, or burial rule, Section 1 and Section 2
Energy Impact Study must assess grid capacity and effects on existing ratepayers; applicant pays grid monitoring costs but not upgrades, Section 4L(ii)-(iii)
Bufferyard 1 under section 27-215 required for all tiers; width not stated in the draft, Section 4 standards table
Lighting shielded so as not to shine into homes, yards, or streets, with a photometric plan showing 0 footcandles at property lines (waivable); not fully shielded, Section 4B
Equipment within 200 ft of roads or sensitive receptors enclosed or screened, and accessory equipment fitted with sound-attenuating structures; no height standard, Section 4F and 27-404(4)(b)
Preparedness, Prevention and Contingency Plan with updates and 24-hour contacts given to responders; no radio coverage or fire company review, Section 4Q and S(e)
Hazardous materials list and safety data sheets disclosed; no storage setbacks or containment, Section 4P
Section 4R(iv) requires a Traffic Impact Study as part of the community impact analysis with every application, but it does not state that the study covers construction traffic or reaches the nearest arterial or interchange.
Delivery routes, road maintenance and repair agreement, and bonding required; no work hours, Section 4S(f)-(h)
Section 1 defines a data center to include cryptocurrency mining, blockchain processing, AI training, and server farms, and excludes computers secondary and customarily incidental to another use, but the exclusion sets no stated size or power limit.
Tier II and III operators submit certified utility billing or peak-demand reports every 12 months, Section 4L(iii)(4)
Section 4L(iii)(4)(b) lets the Township issue code violations, revoke the certificate of occupancy, or halt operations when a tier threshold is breached, but no notice and hearing precede revocation and Sections 616.1 and 617.2 of the Municipalities Planning Code are not cited.
Section 4L(iii)(1) requires the applicant to pay through escrow for an Energy Impact Study by an engineer the Township selects, and Section 4G charges sound studies to the owner, but these costs attach to the conditional use application and operation rather than to consultant review in land development review.
Contact information for the individuals responsible for operation required; developer and end user not named, Section 4S(e)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed conditional use in M-1 (hyperscale), M-1, MX, and RT (mid-scale), and M-1, BP, MX, and RT (edge)
Sources
- moontwppa.portal.civicclerk.com
- moontwppa.portal.civicclerk.com
- moontwppa.portal.civicclerk.com
- moontwppa.api.civicclerk.com
- moontwppa.portal.civicclerk.com
- moontwppa.portal.civicclerk.com
- www.moontwp.us
- ecode360.com
- moontwppa.api.civicclerk.com
- moontwppa.api.civicclerk.com
- moontwppa.api.civicclerk.com
- padatacenterordinances.org
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data