Montour Township

Anti-Data Center Policies

Montour Township’s enacted ordinance restricts data-center locations, requires minimum site sizes and setbacks from homes and other protected places, substantially limiting workable sites and designs while allowing an approval route.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Montour Township
The Board of Supervisors enacted Ordinance No. 2026-04 by a 3-0 vote on September 10, 2026, and the signed ordinance is posted on eCode360.Montour Township, Columbia County — data-center ordinance (No. 2026-04)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements34
  • Conditional use with required public hearings; approval expires if construction has not begun within 1 year, § 3.1(3) and § 4.13(3)

  • 1,000 ft from Agricultural districts and 1,500 ft from agricultural lands as sensitive receptor areas; preserved farmland and agricultural security areas not named, § 4.2(2), § 4.1(4), Art. II

  • Section 4.2(1) sets all buildings, cooling systems, accessory facilities, and accessory structures 1,500 feet from residential district boundaries and lots with existing dwellings, and Section 4.2(5) bars any structure, accessory equipment, or appurtenance from the setback area.

  • Section 4.1(1) treats an assemblage of adjacent parcels owned in common or developed as a unified development as one tract regardless of subdivision, Section 4.1(5) bars staged land development applications, and Section 4.1(5) requires 5,000 feet between data center campuses.

  • Section 4.3(1) sets equivalent levels of 50 dBA by day and 40 dBA at night at the property lines, but the ANSI method and Type I meter in Article II are stated only for establishing the ambient level, not for measuring compliance with the limits.

  • Section 4.3(1) bars noise above the ambient level where ambient is below the limits, and Article II sets a 72-hour ambient test under ANSI S12.18 Method II with a Type I meter, but the ambient is not an L90 measure and no floor is stated below which the rule does not apply.

  • As-built infrasound study with quarterly reporting; no dBC limit, § 4.3(2)

  • Study with the land development application, baseline study before construction, and as-built study 6 months after occupancy; no building permit study, § 4.3(1)

  • Generator testing barred at night and limited to 8:00 a.m. to 8:00 p.m.; no weekday limit or hours cap, § 4.3(1) and § 4.6(5)(b)

  • Water feasibility study by a hydrogeologic professional for nonpublic water; no well restriction or pump test, § 4.4(1)-(3)

  • Closed-loop cooling required; evaporative cooling towers prohibited unless the Supervisors grant an exemption, § 4.5.

  • Projected water demands disclosed and SRBC approval required for large withdrawals; no cap, reporting, or drought plan, § 4.4(3)-(4)

  • Section 4.4(5) requires disposal of cooling and industrial wastewater to be provided for and approved by the Sewage Enforcement Officer or DEP, with a chemical information sheet in the application, but no stage is set for the approval.

  • Environmental assessment must address stormwater effects and woodland removal is limited, § 4.7(1)(a) and § 4.1(2)

  • Diesel generators must be Tier IV certified; no annual emissions testing or reports, § 4.3(1) and § 4.6(5)(d)

  • Environmental assessment must address heat implications; no thermal plan or reuse review, § 4.7(1)(d)

  • Decommissioning plan covers removal and disposal or recycling, including batteries and refrigerants; recycling not required, § 4.12(1) and (4)

  • Electric provider documentation of available capacity at application; no electrical inspection, § 4.6(2).

  • 35% of power must be generated on site from blue or green hydrogen or SMRs, which need not be renewable, and projected demand disclosed, § 4.6(1)-(2)

  • Substations barred from front and side yards; screening and line burial not addressed, § 4.2(4)

  • Required grid upgrades and the entity responsible for costs must be identified, and rate impacts noted, § 4.6(2)-(3)

  • Landscaped or forested buffer adjacent to residential areas, no width set, § 4.9(1)

  • Full cutoff fixtures with 0.1 footcandle limit at residential uses, § 4.10

  • Mechanical equipment including generators enclosed or screened; no height or acoustic standard, § 4.9(2)

  • Emergency Response Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or 24-hour contacts, § 4.11(1)

  • All first responders must receive training specific to the installed system, § 4.11(1)(d)

  • Chemicals associated with wastewater must be disclosed; no storage setbacks or spill containment, § 4.4(5)

  • Annual fire safety inspections, § 4.11(1)(e)

  • Environmental assessment in every case must address traffic implications; no traffic impact study, § 4.7(1)(d)

  • Safe ingress and egress with emergency vehicle access; no road class or secondary access requirement, § 4.9(4)

  • 125% financial security and decommissioning completed within 18 months; no closure notice requirement, § 4.12(2)-(3)

  • Security reviewed bi-annually and recertified every 2 years; no update after the first year, § 4.12(2)

  • Quarterly infrasound reporting to the Township, § 4.3(2)

  • Section 4.4(2) has the township engineer review the water study at the applicant's expense and Article II pays a third-party noise consultant from the operator's escrow, but neither charge is placed in land development review.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in an overlay district of about 483 acres along Legion Road