Monroe Township
Neutral Data Center Policies
Monroe Township’s enacted measures require money to be set aside for eventual data-center removal, increasing costs, while another adds a definition without changing approval or operating rules.
Incentives
Financial Incentive2
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Monroe TownshipThe rules are in Ordinance 2026-4, which the Board of Supervisors enacted on May 26, 2026, together with the data center definition in Ordinance 2026-3, enacted on April 28, 2026.Monroe Township, Snyder County — data-center ordinance / amendment 2026-4
What this means
The measure imposes money set aside for eventual removal. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements22
Only a 100-ft setback for exposed mechanical equipment; no residential setback, § 327.5
Baseline surface water testing only; no impact assessment or riparian buffer
Township noise standards of Subsection 319.1 apply, § 327.3
Predicted worst-case sound study with the application; no later study, § 327.3
Water source and provider capacity documentation, § 327.12.B
Water quantity not disclosed or capped
Proof of discharge permits before approval; no cooling discharge plan, § 327.10
Proof of stormwater and NPDES permits, § 327.10.A
EPA and DEP air permits required before any permit, § 327.7
Utility will-serve letter with the application; no third-party electrical inspection, § 327.12.A.
On-site generation must be disclosed with its permits, § 327.12.D
Required grid upgrades and cost allocation disclosed, § 327.12.A and C.4
Lighting plan to avoid light spill under Subsection 319.14, § 327.6
Emergency management coordination plan with a 24-hour contact, resubmitted every 5 years; no radio coverage, § 327.1
Administrative inspection before occupancy and every 5 years; no annual fire inspections, § 327.1.G and H
Section 327.4 requires every applicant to provide a written assessment of expected construction and operational trip generation, including heavy truck movement, with proposed mitigation such as entrance improvements, turning lanes, and route restrictions.
Mitigation only proposed; no set work hours, routes, or bond
110% security, but no removal deadline or closure notice, § 327.9
Plan and security updated every 5 years, not after the first year, § 327.9
Annual operational summary and water quality testing every 5 years; no noise, water use, or power reports, § 327.8 and § 327.10
Section 327.15 makes each day of violation a separate offense and lets the Township use enforcement notices, civil enforcement, suspension or revocation of permits and approvals to the extent permitted by law, and any other remedy under the Municipalities Planning Code.
Sections 327.1.J and 327.9.D require escrows of $10,000 and $5,000 billed at the actual rates of Township employees and consultants for review of the Emergency Management Coordination Plan and the Decommissioning Plan.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial (I) district
Sources
current law · Monroe TownshipThe Supervisors adopted Ordinance 2026-3, which added a data center definition.Monroe Township, Snyder County — data-center ordinance / amendment 2026-3 (2026-04-28)
What this means
The measure adds a definition for data centers or related computing uses. The described change does not itself establish a new approval route, operating restriction or financial benefit.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data