City of McKeesport

Anti-Data Center Policies

McKeesport does not specifically list data centers, so they generally need special approval and must show they will not cause problems such as traffic, noise, or glare. This may delay projects; the ordinance offers no data-center-specific incentives.

current law · City of McKeesport
Requires data centers, though not specifically named in the zoning ordinance, to get special approval and meet the city’s general land-use and performance standards.City of McKeesport Official Zoning Ordinance (February 2017)

What this means

Data centers are not specifically listed, so they would generally need special approval, which can add review time and delay projects. Applicants must also show the use will not cause problems such as traffic, noise, or glare, and the ordinance provides no data-center-specific incentives.

People behind it

  • Prepared and worked on the zoning ordinance with McKeesport officials.

  • Helped with the planning process that led to the ordinance.

  • Worked with Environmental Planning & Design on the zoning ordinance.

Show 3 more peopleShow fewer people
  • May prepare and present a zoning ordinance at City Council’s request and makes recommendations on proposed amendments.

  • Responsible for adopting or rejecting the ordinance and its amendments.

  • Responsible for administering and enforcing the ordinance.

Restrictions & requirementsHide restrictions & requirements7
  • Data centers are not specifically listed in the ordinance. An unlisted use must go to the Zoning Hearing Board as a special exception; the use table also classifies “all other non-residential uses” as special exceptions. Uses which are not specifically listed

  • A special exception requires a public hearing and site plan. The applicant must show that the use’s impacts are no greater than those of uses listed for the district, that it will not endanger public health or create nuisance conditions, and that it meets applicable ordinance standards; the Board may impose conditions and safeguards. A public hearing shall be held

  • Special-exception approval expires if the applicant does not apply for a building or zoning permit within 12 months. The Board may grant one 12-month extension if requested in writing before the approval expires. within twelve (12) months

  • A zoning permit is required before a structure is built or altered, or a use is established or changed; an occupancy permit is required before a building or lot is used or occupied. Applications require supporting information, including site layout, access and parking, utilities and sewage, and operational impacts. No structure or building shall be erected

  • For an unlisted non-residential use, the City determines the parking and loading requirements rather than applying a fixed number from the table. All Other Non-Residential Uses

  • Applicable performance standards restrict operations, including district-based noise limits: 60 dBA in residential districts for no more than one hour per day, 65 dBA in commercial districts for no more than eight hours per day, and 75 dBA in industrial districts. The ordinance also prohibits vibrations detectable without instruments on neighboring property and limits glare, odors, air pollution, and hazardous-waste disposal. No operation or activity shall cause or create noise

  • Permit and application fees are required under a fee schedule established by City Council; special-exception applicants must also pay applicable fees, including costs for advertising and notices. Fees for permits shall be paid

Benefits & exceptionsHide benefits & exceptions5
  • An unlisted non-residential use may be considered for approval as a special exception rather than automatically excluded. A data center would need to qualify as an unlisted use, meet the ordinance’s criteria—including compatibility, safety, and traffic requirements—and obtain Zoning Hearing Board approval. Uses not specifically listed; all other non-residential uses

  • A zoning-permit application must receive a decision within 90 days. If no decision is issued by then, the application is deemed granted unless the applicant agreed in writing to an extension. within ninety (90) days

  • Building-mounted and ground-mounted solar PV systems are allowed as accessory uses in all zoning districts, subject to permits, zoning requirements, and applicable construction and electrical codes. permitted in all zoning districts

  • Lawfully existing nonconforming uses may continue. Nonconforming structures may be modified, expanded, or enlarged for a legal use if the work does not increase existing nonconformities. A nonconforming land use may expand by up to 25% with Zoning Hearing Board approval and subject to neighborhood-impact limits. may be modified, expanded and/or enlarged; expanded to occupy an area

  • The ordinance does not preclude construction, operation, or maintenance of public-utility distribution, transmission, or collection systems. Such systems must be necessary for the service and, as much as possible, harmonious with uses allowed in the district. Nothing in this Ordinance shall preclude