Borough of Mayfield

Anti-Data Center Policies

Mayfield borough’s enacted ordinance limits noise and building height, requires sound testing and setbacks from homes and other protected places, and adds costs; data centers can still be approved.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Mayfield Borough
Borough Council adopted the rules as Ordinance 2025-14 on December 10, 2025, and its October 14, 2026 agenda listed a public hearing on the new NorLACK zoning ordinance, which the county reported would not permit data centers, together with a motion to readvertise that ordinance with amendments before adoption.Mayfield Borough, Lackawanna County — data-center ordinance (No. 2025-14)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements15
  • 67 dBA day and 57 dBA night at the property line, § 6.500.F.1

  • Section 6.500.F.1 of Ordinance 2025-14 requires preliminary (conditional use), interim (building permit), and as-built sound studies using ANSI S1.4 meters and generally accepted methodology, but the limits apply during normal operations and the as-built study is not required at full operating load.

  • Vibration study showing none perceptible past the property line, § 6.500.F.3.

  • Water feasibility study when nonpublic water is used; no bar on wells for cooling, § 6.500.G.2

  • Projected water demand and uses disclosed, § 6.500.G.2

  • Section 6.500.G.4 requires the applicant to demonstrate that adequate disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP.

  • Utility certification and interconnection agreement; no electrical inspection, § 6.500.H.1 and H.3.

  • Generation for normal operations is a separate use with its own approval, § 6.500.H.2.

  • 25-ft planted buffer, § 6.500.D

  • Equipment within 300 ft enclosed or screened, § 6.500.E.1

  • Emergency plan accepted by the fire department; no annual update, radio, or 24-hour contacts, § 6.500.I.1

  • Plan must ensure responder training; no funding, § 6.500.I.1.d

  • Annual fire safety inspections, § 6.500.I.1.e

  • One as-built sound study after opening, § 6.500.F.1.c

  • Failed as-built study is a violation; no specific penalties, § 6.500.F.1.c

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the C-2 Commercial District