Anti-Data Center Policies

Bucks County’s Newtown-area ordinance allows data centers through an approval process but limits where and how they can operate, with setbacks, minimum site sizes, and noise controls.

Rating and summary from Bucks County as there are no scored current or future laws outside temporary restrictions for Lower Southampton Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Lower Southampton Township
The supervisors authorized advertisement on September 23, 2026, and the township advertised a public hearing for October 28, 2026, with consideration of adoption on that night's agenda, but no outcome has been posted.Lower Southampton Township, Bucks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements16
  • Special exception by the Zoning Hearing Board; approval expires if no zoning permit is obtained within 1 year, § 27-1001.2 and § 27-2307

  • Minimum 250 ft front, side, and rear setbacks from all lot lines, § 27-1403.G(14)(a)3)

  • Sensitive uses protected only by the 250 ft setback from all lot lines, § 27-1403.G(14)(a)3)

  • Maximum building height of 50 ft; rooftop equipment not addressed, § 27-1403.G(14)(a)6)

  • Environmental and Community Impact Analysis required, § 27-1403.G(14)(j)

  • Noise study showing no more than 50 decibels at the property line; no separate day and night limits, § 27-1403.G(14)(f)

  • Professional noise study submitted with the application; no later studies, § 27-1403.G(14)(f)

  • Certification from utilities that the use can be served with water, § 27-1403.G(14)(g)

  • Sewer service certification only; no wastewater or cooling discharge plan, § 27-1403.G(14)(g)

  • Certification from power utilities that the use can be served for electricity; no electrical inspection, § 27-1403.G(14)(g).

  • Power generators mentioned only as part of the facility in the definition; no standards, § 27-202

  • Utility substations counted as part of the data center use in the definition; no screening or placement standard, § 27-202

  • 100 ft side and rear yard buffer to mitigate light and sound; planting not specified, § 27-1403.G(14)(d)

  • Lighting plan showing shielded lighting with no spillover onto adjoining properties, § 27-1403.G(14)(h)

  • Building facades must use varied texture and design, § 27-1403.G(14)(e)

  • Perimeter fencing and security plan only; equipment screening not addressed, § 27-1403.G(14)(i)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: special exception in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data