Lower Saucon Township

Anti-Data Center Policies

Lower Saucon Township requires data centers to meet minimum site-size rules and keep setbacks from homes and other protected places, adding costs and review requirements. Approval remains possible.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Lower Saucon Township
The current rules are in Ordinance No. 2026-02, which Township Council adopted on May 20, 2026, as confirmed by the signed ordinance and the approved Council minutes the township provided in response to a Right-to-Know request on October 27, 2026.Lower Saucon Township, Northampton County — data-center ordinance (No. 2026-02)

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements25
  • Environmental impact assessment required, § 180-127.4.G

  • 55 dBA day and 50 dBA night and weekends at the property line, § 180-127.4.E.1

  • Section 180-127.4.E.1 requires preliminary, interim (building permit), and as-built studies six months after occupancy using ANSI S1.4 sound level meters and generally accepted methodology, but the as-built study is not required at full operating load.

  • Vibration study showing none perceptible past the property line, § 180-127.4.E.4.

  • Water resources impact study with pumping tests; no bar on wells for cooling, § 180-127.4.F

  • Cooling method disclosed and water-cooled systems must be closed loop; evaporative cooling not restricted, § 180-127.4.L.2

  • Projected average and peak water demand, § 180-127.4.F

  • Evidence of adequate sewage disposal with the application; no cooling discharge plan, § 180-127.4.F.1

  • Stormwater plan complying with Chapter 137 required, § 180-127.4.G.2

  • EPA Tier 4 with annual testing and reports, § 180-127.4.H.5 and H.6

  • Electronic waste plan for servers and batteries; refrigerants not named, § 180-127.4.L.4

  • Utility capacity certification and interconnection agreement with the application; no electrical inspection, § 180-127.4.H.2 and H.3.

  • Energy management plan required; rooftop solar only encouraged, § 180-127.4.H.1 and H.7

  • On-site generation is a separate use with its own zoning approval, § 180-127.4.H.4.

  • Substations counted as an accessory use and buffered, § 180-5 and § 180-127.4.C

  • Only rate impacts must be noted; grid upgrades not addressed

  • 100-ft planted buffer yard along all property lines, § 180-127.4.C.

  • Equipment within 400 ft enclosed or screened and 8-ft fence; no 12-ft standard, § 180-127.4.D

  • Architect elevations required; no visual impact study, § 180-127.4.J.1

  • Plan accepted by the fire department with in-building radio coverage; no annual update or 24-hour contacts, § 180-127.4.I

  • Plan must ensure responder training; no funding, § 180-127.4.I.1.e

  • Spill containment required; no storage setback, § 180-127.4.L.1 and H.5

  • Annual fire safety inspections; no electrical inspection, § 180-127.4.I.1.f

  • One as-built sound study after opening, § 180-127.4.E.1.c

  • Section 180-127.4.E.3 lets the Township revoke zoning permits when an owner fails to remediate a sound violation, but no notice or hearing precedes revocation and MPC Sections 616.1 and 617.2 are not cited.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the LM district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data