The Data Center Divide

Lower Mount Bethel Township

Anti-Data Center Policies

Lower Mount Bethel Township’s enacted ordinance still allows data centers in industrial districts, but requires conditional-use approval, studies, and 500-foot home buffers, which may increase costs and delays and limit sites.

current law · Lower Mount Bethel Township
Lower Mount Bethel Township, Northampton County, unanimously adopted data center Ordinance 2026-01 on September 14, 2026, resolving the placeholder number in this row's title.Lower Mount Bethel Township Ordinance 2026-__ (Data Center Ordinance)

What this means

The proposal would still allow data centers in industrial districts, so it is not a ban. But conditional-use approval, required studies, and 500-foot buffers from homes could add costs and delays and limit suitable sites, making development meaningfully harder.

People behind it

  • Proposed a zoning ordinance amendment to establish regulations for Digital Infrastructure Facilities.

  • Held a public hearing to consider the proposed ordinance and voted unanimously to adopt it.

Restrictions & requirementsHide restrictions & requirements9
  • Data centers may be located in the Industrial District only with conditional-use approval.

  • Conditional-use applicants must identify the proposed end user.

  • Applicants must disclose maximum electrical demand at full buildout, identify project-related substations and other infrastructure, and provide utility-capacity documentation, including offsite utility records, applications and correspondence, and information on alternative substation siting or design.

  • Applicants must provide information on water supply, groundwater, cooling water, stormwater and process water, including applicable Delaware River Basin Commission thresholds.

  • The amendment sets a 500-foot buffer from residences, a 300-foot buffer from certain nonresidential Sensitive Receptors, and a 1,000-foot setback for fuel storage.

  • Operating standards address water consumption, containment, thermal impacts, noise, vibration, fire access and public safety, and prescribe certain mechanical, cooling, electrical or fire-protection design methods.

  • Applicants must complete post-construction noise and vibration studies or operational verification; these requirements are tied to release of subdivision and land-development financial security.

  • Applicants must provide a traffic impact analysis covering construction traffic, oversized equipment deliveries, haul routes, staging and temporary traffic control; the Township may require reasonable traffic-management or mitigation measures.

  • After prolonged cessation, specialized equipment and all buildings, structures and improvements must be removed. Financial security must cover decommissioning, removal, disposal and site restoration for the facility's life.

Benefits & exceptionsHide benefits & exceptions2
  • Digital Infrastructure Facilities, including data centers, may seek conditional-use approval in the Industrial District, subject to the ordinance’s standards and review.

  • The Township does not regulate utility service, interconnection, or energy markets; land-use impacts remain subject to Township authority.