Lower Mifflin Township

Anti-Data Center Policies

Lower Mifflin Township’s enacted ordinance requires data centers to keep specified distances from homes and other protected places. Approval remains possible, but the requirements increase construction, compliance, or review costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Lower Mifflin Township
The current rules are in Ordinance 2026-01, a combined data center and solar ordinance that the Supervisors approved on August 20, 2026.Lower Mifflin Township, Cumberland County — data-center ordinance (No. 2026-01)

What this means

The measure imposes setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements19
  • Conditional use, use table; no approval expiration

  • 300-ft setbacks from all lot lines and a 100-ft buffer from residential uses, § 913.1.F

  • 300-ft setbacks from all lot lines protect other uses at less than 1,000 ft, § 913.1.F

  • Underlying district height limit stated as applying, § 913.1.H

  • Single limit of 60 decibels or preexisting levels at any property line, § 913.1.I

  • Ambient baseline study and post-construction sound studies at the applicant's cost, § 913.1.I

  • Hydrogeologic study with Township-approved pumping test plan for on-lot wells; no bar on wells for cooling, § 913.1.A(2)

  • Efficient cooling encouraged only where appropriate, § 913.1.A

  • Annual report of monthly water use for on-lot wells and SRBC approval above thresholds; no drought plan, § 913.1.A(2)

  • Intent to serve letter from the wastewater treatment facility; no cooling discharge plan, § 913.1.A(1)

  • Approved utility service application and interconnection agreement during land development; no electrical inspection, § 913.1.A(1).

  • Renewable energy encouraged only where appropriate; no energy plan, § 913.1.A

  • 100-ft buffer yard with a 10-ft landscaped berm and three rows of trees next to homes and residential zones, § 913.1.F(2).

  • Principal facades must use at least two specific design elements, § 913.1.J.

  • Rooftop sound-producing equipment fully screened to shield sound; no ground equipment height standard, § 913.1.I(1)

  • Emergency contact sign only; no emergency plan, § 913.1.C

  • Annual report of monthly water use where an on-lot well is used, § 913.1.A(2)(ii)

  • Township Engineer or consultant reviews the well study work plan; cost not assigned, § 913.1.A(2)

  • Ownership shown on an entrance sign only; no disclosure before approval, § 913.1.C

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Mixed Use (MU) zone

Sources