Lower Makefield Township
Anti-Data Center Policies
Bucks County’s Newtown-area ordinance allows data centers through an approval process but limits where and how they can operate, with setbacks, minimum site sizes, and noise controls.
Rating and summary from Bucks County as there are no scored current or future laws outside temporary restrictions for Lower Makefield Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Lower Makefield TownshipThe draft adds new § 200-68.A(49) and § 200-69.A(17) to Chapter 200, it has no ordinance number yet, and no hearing date has been confirmed after the supervisors' October 7, 2026 agenda item to authorize advertisement.Lower Makefield Township, Bucks County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements21
LEQ limits of 50, 45, and 45 dB at residential and sensitive receptor properties, but 55 dB by day and 50 dB in the evening at O-R properties, proposed § 200-68.A(49)(d)[3]
Maximum and peak levels are set relative to the LEQ limits, not to background, proposed § 200-68.A(49)(d)[3][c]-[d]
Pure tone limits by octave band down to 16 Hz; no dBC limit, proposed § 200-68.A(49)(d)[3][e]. Version 2.0 gives full credit to octave-band limits at 31.5, 63, and 125 Hz, which the stated range of bands covers, so the limits earn 2 points.
Sound modeling study with the application and an as-built study after occupancy; no building permit study, proposed § 200-68.A(49)(d)[7]
Generator testing may exceed limits only during set daytime hours, for up to 1 hour per 7 days, proposed § 200-68.A(49)(d)[4][e]
Vibration limited to ISO 2631-2 residential day criteria at any property, with a vibration study, proposed § 200-68.A(49)(d)[6]-[7]
Hydrogeologic report with aquifer tests for well withdrawals of 50,000 gpd or more; wells not barred where public water is available, proposed § 200-68.A(49)(e)
Quarterly reports of daily withdrawals for groundwater sources; no drought response plan, proposed § 200-68.A(49)(g)[4]
Water study must describe the amount, means, and temperature of discharges; no approved discharge plan, proposed § 200-68.A(49)(e)[4][d]
Electric provider must certify capacity and service; no third-party electrical inspection, proposed § 200-68.A(49)(k)[1].
Substations counted as data center accessory uses and power equipment within 300 ft enclosed or screened, proposed § 200-7 and § 200-68.A(49)(c)
Known impacts on electric rates or availability must be noted, proposed § 200-68.A(49)(k)[1]
25-ft landscape buffer with a dense four-season native screen, proposed § 200-68.A(49)(b)
Equipment within 300 ft of roads, protected districts, or sensitive receptors fully enclosed or screened; no height or acoustic standard, proposed § 200-68.A(49)(c)
Emergency Response Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or posted contacts, proposed § 200-68.A(49)(l)[1]
Emergency Response Plan must ensure first responders receive system-specific training, proposed § 200-68.A(49)(l)[1][d]
Annual fire safety inspections by a qualified professional, proposed § 200-68.A(49)(l)[1][e]
Construction noise exempt only during daytime hours with noise controls; no haul routes or road bond, proposed § 200-68.A(49)(d)[4][f]
One as-built sound study after occupancy; ongoing water reports apply only to groundwater sources, proposed § 200-68.A(49)(d)[7] and (g)[4]
As-built noise violations are violations of the ordinance, and the township may draw on water security, proposed § 200-68.A(49)(d)[7] and (i)
A Data Center Operator is defined, but no disclosure is required, proposed § 200-7
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the O-R Office/Research District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data