Lower Heidelberg Township’s enacted ordinance limits noise and building height, requires sound testing and setbacks from homes and other protected places, and adds costs; data centers can still be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Lower Heidelberg TownshipThe Board of Supervisors enacted it as Ordinance No. 634 on September 15, 2026, after South Heidelberg (Ordinance No. 296, August 25, 2026) and Wernersville (Ordinance No. 645, September 2, 2026), and the next step is for the adopted text to be posted on eCode360 or the township website.Lower Heidelberg Township, Berks County — data-center ordinance (No. 634)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements13
Conditional use in I-3 Limited Industrial District only, § 423.3(e)
Conditional use; no approval expiration, § 423.3(e)
Sensitive receptor defined but no data center setback
60 ft; no rooftop equipment limit, § 532.a.i
67 dBA day and 57 dBA night at lot line, § 532.c
The shared ordinance text (Wernersville Ordinance 645, noise study section, matching Lower Heidelberg Section 532.d) requires preliminary, interim, and as-built noise studies using ANSI S1.4-2014 meters, but the as-built study is not required at full operating load.
Generator testing subject to noise limits only
Water feasibility study applies to all I-3 uses and is not stated for data centers, § 423.5.p.i
Substations are part of the use, and equipment must sit behind the principal building away from streets and dwellings; no screening or buried lines, §§ 201 and 532.a.v
Buffer yards apply to large warehouses only
As-built noise study after occupancy, more on request, § 532.d.iii
Owner must remediate noise violations, § 532.d.iii
Applicant pays for own noise studies; no independent review
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the I-3 Limited Industrial District (joint zoning)