Longswamp Township

Anti-Data Center Policies

Longswamp Township’s enacted ordinance requires money to be set aside for eventual removal, limits noise and requires sound testing and setbacks from protected places. Data centers can still be approved, but these requirements add costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Longswamp Township
The Board of Supervisors enacted these standards as Ordinance No. 309 (listed by the township as Ordinance 2026-309) on August 25, 2026, after a public hearing the same evening, according to the signed ordinance and the posted minutes.Longswamp Township, Berks County — data-center ordinance (No. 309)

What this means

The measure imposes money set aside for eventual removal, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements21
  • Township Riparian Buffer Conservation Ordinance and SALDO woodland rules stated as applying, § 7114.2.q and r

  • Section 609.4 limits plus no increase in the 24-hour average level at residential and non-HC or I property lines, § 7114.2.p

  • Preliminary study in the conditional use process, interim study, and as-built study 6 months after occupancy, ANSI S1.4 meters, § 7114.2.p

  • Section 609.4 vibration rules apply and a vibration study is required; numeric limit not in the amendment, § 7114.2.p

  • Public water adequacy letter, or on-lot supply with water resources impact study when triggered and well permits; no pump test standard, § 7114.2.c

  • Sewage service adequacy letter or on-lot sewage capacity under DEP rules; cooling wastewater not addressed, § 7114.2.c

  • On-site generation must show ability to comply with federal and state rules, § 7114.2.e

  • Thermal impact mitigation plan with off-site thermal impact evaluation, no heat beyond lot lines, and waste heat reuse evaluation, § 7114.2.j

  • Electronic Waste Plan for servers, batteries, and hazardous materials reviewed by BCSWA; no disposal contract, § 7114.2.m

  • Energy management plan with annual demand, sources, storage, and growth; no phase peaks or solar requirement, § 7114.2.d(i)

  • On-site generation addressed with a fire chief safety plan and impact analysis; not a separate use, § 7114.2.e

  • Buffer yard under § 609.12 with planting screen under § 604; width not in the amendment, § 7114.2.g

  • 8-ft perimeter fence only; equipment screening not required, § 7114.2.h

  • Fire protection and emergency response plan reviewed with the fire chief and emergency management coordinator, § 7114.2.k

  • Hazardous materials plan must show local responder resources are adequate or will be supplemented by the data center, § 7114.2.b

  • Hazardous materials management plan with spill prevention and containment; no storage setbacks, § 7114.2.b

  • Annual fire chief site inspection of on-site generation safety plan; no report or correction deadline, § 7114.2.e

  • Large data centers need 300 ft of arterial or collector frontage, and a second emergency access is required, § 7114.3.a and 2.k

  • Large data centers: 125% guarantee before building permit, abandonment at 12 months, removal within 12 months; not recorded, § 7114.3.c

  • One as-built sound study 6 months after occupancy, § 7114.2.p(iii)

  • Zoning permits may be revoked if a sound violation is not fixed within 90 days; no MPC enforcement reference, § 7114.2.p(vi)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I Industrial District