London Grove Township

Anti-Data Center Policies

London Grove Township’s enacted ordinance requires data centers to meet cooling and water-use rules, noise limits and testing, and setbacks from homes and other protected places; approval remains possible, but compliance and review may cost more.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · London Grove Township
The standards in new Section 27-1847 were adopted by the Board of Supervisors on September 9, 2026 as Ordinance No. 231-2026, which took effect immediately.London Grove Township, Chester County — data-center ordinance (No. 231-2026)

What this means

The measure imposes cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements24
  • 50 ft maximum; rooftop equipment not limited, § 27-1847.4

  • 55 dBA day and 45 dBA night at residential receptors (65 and 55 dBA at industrial), § 27-1847.8, Table 2

  • Section 27-1847.8, Table 6, treats an increase of 3 dBA or more above the baseline ambient level documented before construction as a violation, measured with a Type 1 or Type 2 ANSI meter, but the baseline is not defined as L90 and no floor is set below which the cap does not apply.

  • 70 dBC day and 60 dBC night, § 27-1847.8, Table 3

  • Study with the conditional use application and as-built study within 180 days; none at building permit, § 27-1847.8(a) and (c)

  • Numeric vibration limits of 65 VdB and PPV with studies; not a no-perceptible-vibration standard, § 27-1847.8(c)(6)

  • Public water required and groundwater barred as the primary cooling source; no hydrogeologic study for any well use, § 27-1847.9(a) and (d)

  • Air-cooled or closed-loop cooling required unless an approved alternative uses less water and energy, § 27-1847.9(e).

  • Section 27-1847.9(f) and (g) require a drought response plan showing compliance with state, water supplier, and local drought declarations and annual reports to the Township of water usage records from the public water supply the data center must document.

  • Diesel generators must meet EPA Tier 4 with annual testing reports, § 27-1847.11(b)(i)-(ii)

  • Electronic Waste Plan for servers, batteries, and hazardous materials, with refrigerant disposal at decommissioning, § 27-1847.15 and .16(d).

  • Utility interconnection application and energization date documented; no capacity letter or electrical inspection, § 27-1847.11(a)(vi)

  • Energy usage plan with documented renewable efforts; no on-site renewable requirement, § 27-1847.7 and .11(a)

  • On-site generation is a separate principal use with its own approval, § 27-1847.12(a).

  • Substations at the side or rear and screened, and on-site lines of 34.5 kV or less buried, § 27-1847.12(b)-(d)

  • Equipment screened on all sides; no height or acoustic standard, § 27-1847.5

  • Elevations and renderings required with the application, § 27-1847.6

  • Plan reviewed by the fire department, with radio coverage and posted 24-hour contacts; no annual updates, § 27-1847.13

  • Hazardous materials covered in the waste and decommissioning plans; no storage setbacks or containment, § 27-1847.15 and .16(d)

  • Annual fire safety inspections, § 27-1847.13(a)[5]

  • Construction plan sets construction vehicle access times and locations; no road bond, § 27-1847.14

  • Financial security for full cost and closure notice; completion within 18 months, § 27-1847.16

  • Annual water usage reports after opening, § 27-1847.9(g)

  • Township engineer or consultant may review monitoring data; cost not assigned, § 27-1847.8(c)(8)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data