City of Lock Haven
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for City of Lock Haven.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Lock Haven CityCity Council held hearings on the draft (Ordinance 2026-06) on July 20 and August 10, 2026, and the city's notice schedules a further public hearing and a final adoption vote on October 19, 2026.Lock Haven City, Clinton County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements5
Conditional use with City Council hearing; no 1-year expiration of approval
Section 410-412.B(6) requires a data center to be at least 3,000 ft from another data center, but the section does not regulate a campus on commonly controlled lots as one use or apply performance limits to the combined output of nearby data centers.
Section 410-412.B(3) requires sound mitigation so that data center sound does not exceed the ambient levels found in a third-party baseline study, and Section 410-412.B(4) requires post-construction noise studies, but no L90 or other measurement statistic is stated and no floor sets a level below which the cap does not apply.
Mitigation design before building permit and post-opening study; no study required with application, § 410-412.B(3)-(4)
Annual noise studies for five years reported to the city, § 410-412.B(4)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Conditional use in the Industrial District (draft)
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data