Liberty Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Liberty Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Liberty Township
The undated draft, Ordinance No. 2026- with the number left blank, was emailed by the township secretary on October 27, 2026, who said it is with the township solicitor, and no hearing or vote date has been announced.Liberty Township, Centre County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements34
  • Conditional use with a Board hearing; approval expires if construction does not begin within 12 months, Sections 3.D and 3.J

  • Section 4.B sets an all-inclusive 40 ft limit with rooftop mechanical equipment recessed 5 ft below the roofline, but the L-1 district height limit for other principal buildings is not in the ordinance text read.

  • Riparian buffers of 100 to 200 ft by water type, with a 200 ft minimum from any stream or wetland for data centers, Sections 5.D and 9.B

  • Added load over 10%, footprint, or outdoor equipment requires an amended conditional use with a new hearing, Sections 3.F and 15.D.

  • 55 dBA day and 52 dBA night caps at sensitive receptor property lines, Section 7.A.3

  • Section 7.A.1 caps sound at 3 dBA above a pre-construction ambient baseline from a baseline study, with measurements by industry accepted methodologies (Section 7.G), but the baseline is not defined as L90 and no floor is set below which the cap does not apply.

  • Single 65 dBC limit at residential property lines, Section 7.C

  • Baseline study before approval and audits at 30 days and 6 months after opening; none at building permit, Section 7.E

  • Section 7.A.4 and Sections 8.C.5 to 8.C.7 limit routine testing to 10:00 AM to 4:00 PM, Monday through Friday, at 1 hour per generator per month, while Section 8.C.5 allows operation as otherwise required by law.

  • Section 7.D.1 sets a 0.001 g limit above baseline ambient vibration at Sensitive Receptor property lines with vibration audits, but the measurement methodology is left to the Township Engineer and Section 7.G refers only to industry accepted methodologies.

  • Public water required and wells barred for cooling; any non-public source needs a hydrogeologist study with empirical testing of drawdown, Sections 8.A.2 and 8.B.2 to 8.B.3

  • Closed-loop air-cooled chillers required; evaporative and open-loop cooling prohibited, Section 8.A

  • 1,500 gpd per MW and 7,500 gpd caps, with drought stress test and water reduction plan, Sections 8.B.1 and 8.B.7.

  • Section 7.H.6 and Section 8.B.4 classify cooling blowdown as industrial waste, require a Wastewater Characterization Study, and permit sewer discharge only with an approved pre-treatment agreement and a DEP WQM permit, or else ZLD or a licensed hauler contract, but the approvals are not required before the zoning permit.

  • Section 7.H.6(b) designates the site a Stormwater Hotspot with structural BMPs treating 100 percent of runoff for hydrocarbons and heavy metals, but no spill containment is required for fuel, generator, and transformer areas (the Section 11 secondary containment covers fire suppression water).

  • EPA Tier 4 Final generators with annual generator testing and reporting, Sections 7.H.3(b), 8.C.6, and 11.C

  • Heat island limit at the property line with CFD modeling; no waste heat reuse review, Section 7.H.2(c)

  • Utility certification and interconnection agreement before approval; no third-party electrical inspection, Sections 8.C.1 and 15.A.3.

  • 50% renewable sourcing by PPAs, RECs, or on-site generation; on-site renewables not required, Section 8.C.8 to 8.C.9

  • On-site generation for normal operations is a separate use meeting its own zoning requirements, Sections 2 and 8.C.4.

  • Substations screened by 8 ft wall and buffer, placed behind the building where feasible; on-site lines buried, Sections 5.F, 5.G, and 18.F

  • Section 8.C.1 to 8.C.3 require an Interconnection Agreement, a Grid Impact Study identifying required transmission upgrades and off-site improvements, and a Service Impact Analysis, but no estimated upgrade cost or tariff terms are required.

  • 8 ft berm with evergreen rows along residential property lines; no buffer width, Sections 6.A and 6.B

  • Full cut-off fixtures, 0.05 footcandle limit, no light crossing property lines, Sections 6.D and 6.E

  • Leaf-off balloon test and viewshed analysis from historic sites; public roads not required, Sections 5.M and 14.B.2(b)

  • Fuel and hazardous storage barred in riparian buffers, with secondary containment for fire water, Sections 9.F.6 and 11.G.3.

  • Annual Fire Marshal safety inspections; no third-party electrical inspection, Section 20.D

  • Section 14.B.1(c) requires a traffic study in every ECIA covering trip frequencies and types, heavy equipment delivery during construction, and fuel deliveries, but no study area reaching the nearest arterial or interchange is stated.

  • 150% security and 12-month abandonment; no closure notice or 6-month removal deadline, Section 17

  • Estimate updated annually and security reviewed every 5 years, Sections 17.A.1(c) and 17.B

  • Annual certified compliance reports and quarterly summaries posted online, Section 7.E.3

  • Section 19.C requires written notice of violation and an opportunity to cure, Section 21.D allows the Board of Supervisors to revoke or suspend the conditional use after a public hearing for habitual non-compliance, and Section 21.B applies penalties under MPC Section 617.2.

  • Section 20.A requires an administrative escrow with the conditional use application to pay the Township's consultants to review studies and testify at hearings, so the review occurs at the zoning stage rather than in land development review.

  • Ultimate parent entity of the operator must be disclosed; no end user, Section 16.A

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Conditional use in the L-1 Light Industrial District (proposed)

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data