Lewis Township

Anti-Data Center Policies

Lewis Township’s enacted ordinance limits noise, requires sound testing, and sets setbacks from homes and other protected places. Data centers can still be approved, but must meet these requirements, which add costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Lewis Township
The current rules are in the new Zoning Ordinance, Ordinance 2026-1, which the supervisors adopted on April 1, 2026.Lewis Township, Northumberland County — data-center ordinance (No. 2026-1)

What this means

The measure imposes noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements14
  • Only a 100-ft buffer beyond the base setback; no residential setback distance, § 482.B

  • 40-ft Industrial District height; accessory uses no taller than the principal building, § 482.A and § 303.G

  • 67 dBA day and 57 dBA night at the property line, § 482.C.1

  • Section 482.C.1 requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but the limits apply during normal operations and no measured study is required at full operating load.

  • Vibration study showing none perceptible past the property line, § 482.C.3.

  • Public water supply with will-serve letter required; no wells, § 482.D.1

  • Section 482.D.2 requires the data center to be served by public wastewater disposal, including wastewater used for cooling or industrial purposes, approved by the Sewage Enforcement Officer or the Pennsylvania DEP, as a conditional use standard.

  • Utility capacity certification with the application; no electrical inspection, § 482.E.1.

  • Power generation is a separate use with its own approval, § 482.E.2.

  • 100-ft planted buffer next to RR, R, and VC districts, § 482.B.

  • Emergency plan accepted by fire and EMS; no annual update, radio, or 24-hour contacts, § 482.F.1

  • Plan must ensure responder training; no funding, § 482.F.1.d

  • Annual fire safety inspections, § 482.F.1.e

  • One as-built sound study six months after occupancy, § 482.C.1.c

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial District