Borough of Leesport
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Borough of Leesport.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Leesport BoroughThe undated draft, with the ordinance number, hearing date, and enactment date left blank, was provided by the Borough Solicitor's office on October 27, 2026 as the most recent draft reviewed by the borough, and no hearing or vote date has been announced.Leesport Borough, Berks County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements28
Section 405.8b(1)(k) requires 3,000 ft from any data center on another property, and the definition treats parcels in a single land development plan as one data center, but lots under common ownership or control filed separately are not regulated as one use.
Section 405.8b(11)(a) sets 50 dBA day and 45 dBA night as 5-minute LAeq at residential, school, church, and day care properties, measured with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994 by a qualified acoustical consultant.
60 dBC day and 55 dBC night at residential and similar properties, § 405.8b(11)(a)
Section 405.8b(12) requires a preliminary study with the application, an interim study at building permit, an as-built study within three months of occupancy, and quarterly studies after six months, but no study is required at full operating load.
Testing capped at 50 hours per year and barred on unhealthy air days; no daytime limit, § 405.8b(22)(c)
Public water required and no on-lot well may be used, with a water feasibility study, § 405.8b(16) and (19)
Section 405.8b(8) requires a closed-loop liquid-based cooling system, bars air cooling as the primary system, and requires cooling fluids and condensate to be hauled off site, but it does not limit the water use of any evaporative heat rejection or tie it to the noise limits.
Projected water demand disclosed; no cap, reporting, or drought plan, § 405.8b(18)-(19)
Cooling fluids and condensate may not be discharged to sewer or stormwater and must be removed off site; no discharge plan approval, § 405.8b(8)
Secondary containment for fire suppression water and cooling fluids to keep runoff out of storm sewers; no general stormwater standards, § 405.8b(8) and (10)
Natural gas generators that must meet state and federal air rules, with annual run-time reports and boundary air monitors; no EPA Tier 4 standard, § 405.8b(22)-(23)
Electronic Waste Plan for removal and recycling of servers, batteries, hazardous materials, and electronic waste at upgrade or decommissioning, § 405.8b(21).
Interconnection agreement showing available capacity with the application; no electrical inspection, § 405.8b(20).
Energy Usage Plan with documented renewable efforts and 10 percent renewable procurement above 50 MW; rooftop solar not required, § 405.8b(15)(b)-(c)
Substations counted as Data Center Equipment and limited to the rear yard; screening and line burial not addressed for substations, Section 1 definition and § 405.8b(1)(i)
Known impacts on electric rates must be noted; cost of grid upgrades not assigned, § 405.8b(20)
Berm and dense evergreen and deciduous buffer next to residential districts and uses; width not stated, § 405.8b(29)(c)
Facades must include two design elements every 100 ft, § 405.8b(29)(a).
Ground and roof equipment screened with noise mitigation; no 12-ft standard, § 405.8b(29)(b)
Emergency Response Plan approved by the Fire Chief and emergency contacts provided; no annual updates or radio coverage, § 405.8b(2) and (28)
Section 405.8b(6) and (7) require annual responder training at the data center's expense and specialized equipment supplied to the local fire and EMS providers, but training is not required before occupancy and the equipment is not kept on site.
Spill containment for batteries, cooling fluids, and fire water; no hazardous materials storage setbacks, § 405.8b(8) and (10)
Secondary emergency access required; no arterial or collector road requirement, § 405.8b(4)
Section 405.8b(30) requires security of at least 125 percent of net decommissioning cost, a utility notice of a 50 percent drop in use, and removal within six months, but the agreement is not recorded and buildings are not required to be removed unless reused within two years.
Estimate submitted at zoning permit and every fifth year; no update after the first year, § 405.8b(30)
Quarterly noise studies after opening and annual generator run-time reports, § 405.8b(12)(d) and (22)(g)
Owner must remediate noise violations; no specific penalties, § 405.8b(12)(c)-(d)
Section 405.8b(19)(k) lets the Borough retain professionals at the applicant's cost to review water impact studies, but the review is not tied to land development review and other studies are not covered.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Conditional use in the I Industrial District (proposed)
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data