Leacock Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Leacock Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Leacock Township
The draft, which has no ordinance number and would add Section 310-157 to the zoning chapter, had not yet been sent to the Lancaster County Planning Commission as of October 19, 2026, and no hearing date has been set.Leacock Township, Lancaster County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements15
  • Only street setbacks measured from the center line; no residential setback, § 310-157B(5)

  • 40 ft maximum; rooftop equipment not limited, § 310-157B(1)

  • Single limit of 67 dB at the property line, § 310-157D(1)

  • Section 310-157D(1)(a) to (c) requires preliminary, interim, and as-built studies using ANSI S1.4 meters and generally accepted methodology.

  • Generator testing allowed up to 80 dB with no hours limit, § 310-157D(2)

  • Hazardous materials removed at decommissioning under state and federal law, § 310-157H(2)

  • Utility certification of capacity in all seasons and at peak; no electrical inspection, § 310-157E(1).

  • Only known rate impacts must be noted, § 310-157E(1)

  • Perimeter fencing permitted; no equipment screening, § 310-157C

  • Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or posted contacts, § 310-157F(1)(a)

  • First responders must receive system-specific training at no cost, § 310-157F(1)(b).

  • Annual fire safety inspections, § 310-157F(1)(c)

  • Decommissioning plan without financial security, § 310-157H

  • As-built sound study after occupancy, § 310-157D(1)(c)

  • As-built noise violation treated as an ordinance violation, § 310-157D(1)(c)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data