Lancaster Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Lancaster Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Lancaster Township
The township posted draft Ordinance No. 2026-127 with a fact sheet dated October 19, 2026, and the supervisors' October 12, 2026 workshop agenda listed a motion to refer the final draft to the Butler County Planning Commission and to advertise a November 16, 2026 public hearing on its adoption.Lancaster Township, Butler County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose money set aside for eventual removal, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements30
  • Conditional use before the Board of Supervisors; no one-year expiration of approval, Section III

  • Inventory of natural resources, habitats, and wildlife with PNDI receipt required; no riparian buffer, (m)(iii)

  • Single limit of 55 dB at all property lines; no separate night limit, (d)(i)

  • Subsection (d)(i)(a) to (c) requires a preliminary study with the conditional use application, an interim study at building permit, and an as-built study six months after occupancy, using ANSI S1.4 meters and generally accepted methodology.

  • Vibration study required with a 0.12 in/sec peak particle velocity limit at the property line rather than a no-perceptible standard, (d)(ii)

  • Water feasibility study by a licensed geologist for nonpublic sources with well testing before a constant-rate aquifer test; wells for cooling not barred, (e)(ii)-(iii)

  • Cooling method not required to be disclosed or restricted

  • Projected water demand and use by purpose disclosed in the feasibility study for nonpublic sources; no cap, reporting, or drought plan, (e)(ii)

  • Disposal of wastewater used for cooling must be provided and approved by the Sewage Enforcement Officer, sanitary authority, or DEP as part of the application, (e)(v)

  • Emissions must meet applicable federal, state, county, and local standards; no Tier 4 requirement, (m)(ii)

  • E-Waste Plan for removal and recycling of servers, batteries, and hazardous materials including coolants, (h)(ii).

  • Electric provider documentation certifying available capacity; no third-party electrical inspection before occupancy, (f)(i).

  • Comprehensive energy use plan required; no on-site renewable requirement, (f)(iii)

  • Electrical substations counted as data center accessory uses and power supply equipment near roads and homes screened, Section I definitions and (c)

  • Known electric rate impacts and necessary infrastructure improvements must be identified; contributions only if offered, (f)(iii) and (m)(iv)

  • 80 ft planted buffer yard around the entire perimeter, (b)(i)(c)

  • Lighting directed to minimize glare and held to the district light limit with photometric studies; full shielding not required, (a)(vii)

  • Facades facing roads, residential districts, or homes need two design elements every 150 horizontal feet, (k)(i).

  • Equipment within 300 ft of roads, residential districts, or sensitive receptors must be enclosed or screened; no all-sides, height, or acoustic standard, (c)

  • Emergency Response Plan reviewed and accepted by the fire department, with annual fire safety inspections and posted emergency contacts; no annual plan updates or radio coverage, (j)(i) and (a)(vi)

  • Plan must ensure first responders receive system-specific training; funding not required, (j)(i)(d)

  • Hazardous materials such as diesel fuel and coolants must be addressed in the E-Waste Plan; no storage setbacks or spill containment, (h)(ii)

  • Annual fire safety inspections by a qualified professional; no third-party electrical inspection before occupancy, (j)(i)(e)

  • Construction traffic must be coordinated with school districts around drop-off and pick-up times; no work hours, haul routes, or road bond, (m)(v)

  • Security of 110% and 60 days notice, but removal allowed 18 months after abandonment rather than 6, (l)(ii)-(iii)

  • Decommissioning plan and security amount reviewed every two years after occupancy, (l)(i)-(ii)

  • Section I defines Data Center to include cryptocurrency mining, blockchain processing, and server farms, and defines Server Farm to include artificial intelligence training at 20 or more racks while excluding accessory enterprise server rooms and edge installations under 500 square feet.

  • One as-built sound and light study after occupancy, with later studies only at the township's option, (d)(i)(c)-(d) and (a)(vii)

  • Township may contract its own sound and light studies at the applicant's cost; no paid review of the applicant's studies, (d)(i)(d) and (a)(vii)(c)

  • Developer, operator, and end user not required to be named before approval

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I Industrial District