Borough of Kutztown
Anti-Data Center Policies
Kutztown borough’s enacted ordinance requires data centers to meet cooling, water-use and noise rules, provide technical studies and undergo utility checks; approval remains possible, but compliance and review may cost more.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Kutztown BoroughThe current rules are in Ordinance No. 2-2026, which Borough Council enacted on September 15, 2026.Kutztown Borough, Berks County — data-center ordinance (No. 2-2026)
What this means
The measure imposes cooling and water-use rules, technical studies and utility checks and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements25
Base height of 35 ft (LI) or 50 ft (MI, HI); no rooftop equipment limit, § 225-21 B(1) and § 225-33.6 C
Water impact analysis for major expansions only, § 225-33.6 E(5)
Base limits of 60/50 dBA (LI), 65/60 dBA (MI), and 70 dBA (HI) apply, § 225-21 B(1) and § 225-33.6 D(1)
Low-frequency noise analysis in preliminary study; no dBC limit, § 225-33.6 D(1)(a)
Section 225-33.6 D(1) requires preliminary, interim, and as-built sound studies by a professional acoustical expert, with the as-built study six months after the certificate of occupancy, but no measurement method is stated and the as-built study is not required at full operating load.
Generators exempt from limits during outages; no testing limits, § 225-33.6 D(2)
Vibration study showing none perceptible past the property line, § 225-33.6 D(3).
Water feasibility study for nonpublic sources; no well bar or pump tests, § 225-33.6 E(2)
Closed-loop required only with public water; evaporative allowed off public water, § 225-33.6 E(4)
Annual water usage report; no drought plan, § 225-33.6 E(3)(b)
Cooling wastewater disposal approved by SEO or DEP as part of application, § 225-33.6 E(7)
Decommissioning plan covers disposal or recycling of materials, § 225-33.6 J
Electric provider capacity certification with application; no third-party inspection, § 225-33.6 F(1).
On-site generation is a separate principal use with its own approval, § 225-33.6 F(2).
Substations counted as accessory uses; no screening rule, § 225-5
Section 225-33.6 F(1) requires a letter from the electric service provider confirming capacity, a note of known impacts on electric rates, and payment by the applicant of all power infrastructure costs, but the applicant is not required to disclose the needed grid upgrades and their estimated cost or the tariff terms, or to file an executed service agreement before a zoning permit.
Earthen berm averaging 5 ft high with plantings on some lot lines, § 225-33.6 C(2)
Berm screening where visible; no equipment screening height, § 225-33.6 C(2)
Plan accepted by fire department; no annual updates, radio coverage, or posted contacts, § 225-33.6 G(1)
Plan must ensure first responder training; funding not assigned, § 225-33.6 G(1)(d)
Annual fire safety inspections; no third-party electrical inspection, § 225-33.6 G(1)(e)
Plan, agreement, and bond; no 110% amount or removal deadline, § 225-33.6 J
Annual water usage reports, § 225-33.6 E(3)(b)
Section 5 provides fines of up to $1,000 per day for water standard violations and allows the Borough to suspend operations temporarily for severe noncompliance, but no revocation grounds with notice and a hearing are stated and Sections 616.1 and 617.2 of the Municipalities Planning Code are not cited.
Pre-application presentation to Planning Commission only, § 225-33.6 B
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial districts, except the Medium Industrial Overlay
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data