Kidder Township
Anti-Data Center Policies
Kidder Township’s enacted ordinance requires data centers to meet minimum site-size and setback rules, narrowing where they can be built while retaining an approval route.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Kidder TownshipThe current rules are in Ordinance No. 200, which the Supervisors adopted on March 26, 2026.Kidder Township, Carbon County — data-center ordinance (No. 200)
What this means
The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements25
Conditional use, § 180-96A; no expiration of approval
100-ft riparian forest buffer each side, wider on slopes and at wetlands, § 180-96L(4)
Section 180-96F(1)(a) limits 5-minute LAeq sound at any location on a residential receiving property to 50 dBA by day and 45 dBA at night, measured by an acoustical engineer with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994.
60 dBC day, 55 dBC night at residential receiving property, § 180-96F(1)(a)
Sound study only when otherwise required, § 180-96F(1)(c)
Water feasibility study for nonpublic sources, § 180-96G(2)
Cooling water use described; alternative cooling feasibility study, § 180-96G(2)(c), G(5)
Projected water demand disclosed, § 180-96G(2)(a)
Section 180-96G(4) requires the applicant to demonstrate that adequate disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP.
State stormwater rules stated as applying in riparian buffers, § 180-96L(4)(k)
Generators must meet federal, state, and local rules, § 180-96H(6)
Discharge cooling to ambient temperature must be described, § 180-96G(2)(k)
Plan for servers and batteries; refrigerant disposal at decommissioning, § 180-96I(1)(j), M(4)(b).
Utility capacity certification with application; no electrical inspection, § 180-96H(1).
Power supply report required, § 180-96H(1)
Power equipment screened and counted as accessory use; buried lines only suggested, § 180-96E, H(4)
Rate impacts and infrastructure burden must be shown, § 180-96H(1), H(5)
100-ft landscape buffer on all adjoining lines, § 180-96D(1).
Equipment within 300 ft of roads or homes enclosed and screened, § 180-96E(1)
Architectural rendering and plot plan required, § 180-96J(2)
Plan accepted by fire department, radio coverage, 24-hour contacts; no annual update, § 180-96I(1)
Battery building setbacks and containment; fuel spill containment, § 180-96H(3), I(3), I(4).
Annual fire safety inspections; no electrical inspection, § 180-96I(1)(k)
110% security; removal within 18 months, no closure notice, § 180-96M
Security reviewed biannually, § 180-96M(2)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the BD/LI District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data