Kidder Township’s enacted ordinance requires data centers to meet minimum site-size and setback rules, narrowing where they can be built while retaining an approval route.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Kidder Township
The current rules are in Ordinance No. 200, which the Supervisors adopted on March 26, 2026.Kidder Township, Carbon County — data-center ordinance (No. 200)

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements25
  • Conditional use, § 180-96A; no expiration of approval

  • 100-ft riparian forest buffer each side, wider on slopes and at wetlands, § 180-96L(4)

  • Section 180-96F(1)(a) limits 5-minute LAeq sound at any location on a residential receiving property to 50 dBA by day and 45 dBA at night, measured by an acoustical engineer with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994.

  • 60 dBC day, 55 dBC night at residential receiving property, § 180-96F(1)(a)

  • Sound study only when otherwise required, § 180-96F(1)(c)

  • Water feasibility study for nonpublic sources, § 180-96G(2)

  • Cooling water use described; alternative cooling feasibility study, § 180-96G(2)(c), G(5)

  • Projected water demand disclosed, § 180-96G(2)(a)

  • Section 180-96G(4) requires the applicant to demonstrate that adequate disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP.

  • State stormwater rules stated as applying in riparian buffers, § 180-96L(4)(k)

  • Generators must meet federal, state, and local rules, § 180-96H(6)

  • Discharge cooling to ambient temperature must be described, § 180-96G(2)(k)

  • Plan for servers and batteries; refrigerant disposal at decommissioning, § 180-96I(1)(j), M(4)(b).

  • Utility capacity certification with application; no electrical inspection, § 180-96H(1).

  • Power supply report required, § 180-96H(1)

  • Power equipment screened and counted as accessory use; buried lines only suggested, § 180-96E, H(4)

  • Rate impacts and infrastructure burden must be shown, § 180-96H(1), H(5)

  • 100-ft landscape buffer on all adjoining lines, § 180-96D(1).

  • Equipment within 300 ft of roads or homes enclosed and screened, § 180-96E(1)

  • Architectural rendering and plot plan required, § 180-96J(2)

  • Plan accepted by fire department, radio coverage, 24-hour contacts; no annual update, § 180-96I(1)

  • Battery building setbacks and containment; fuel spill containment, § 180-96H(3), I(3), I(4).

  • Annual fire safety inspections; no electrical inspection, § 180-96I(1)(k)

  • 110% security; removal within 18 months, no closure notice, § 180-96M

  • Security reviewed biannually, § 180-96M(2)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the BD/LI District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data