Kelly Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Kelly Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Kelly TownshipThe Supervisors' August 19, 2026 work session agenda listed adoption of a Cryptocurrency and Data Mining ordinance with its number left blank, and the Daily Item reported on September 19, 2026 that the Supervisors approved a data center ordinance in August, but no minutes of the vote or signed copy has been posted.Kelly Township, Union County — proposed data-center ordinance (None Adopted)
What this means
The proposal would allow data centers by right in designated districts, subject to noise limits and sound testing. The clearer approval route offers a modest benefit, but it does not remove the remaining site and operating conditions.
Restrictions & requirementsHide restrictions & requirements21
Permitted by right in the Commercial-Highway-Manufacturing and Institutional districts, Section 1 of the draft and § 27-446(1)
Permitted by right with Zoning Officer approval; no conditional use or special exception, § 27-306 and § 27-307
67 dBA weekday daytime and 57 dBA night and weekends at the property line, § 27-446(6)(a)
Draft Section 27-446(6)(a)(1) to (3) requires preliminary (land development), interim (building permit), and as-built sound studies six months after occupancy using ANSI S1.4 meters and generally accepted methodology, but the limits apply during normal operations and the as-built study is not required at full operating load.
Vibration study showing no vibration perceptible beyond the property line, § 27-446(6)(c).
Water feasibility study required for nonpublic sources; public supplier certification otherwise, § 27-446(7)(a) and (b)
Projected water demands disclosed and SRBC approval above thresholds, § 27-446(7)(b)(1) and (c)
Draft Section 27-446(7)(d) requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Township Sewage Enforcement Officer or DEP.
Decommissioning plan covers removal of e-waste, batteries, fuel, and refrigerants, § 27-446(12)(a) and (b)(2)
Electric provider must certify capacity and service; no electrical inspection, § 27-446(8)(a).
Known impacts on electric rates or availability must be noted, § 27-446(8)(a)
25 ft landscape buffer next to residential districts, sensitive receptors, and roads, § 27-446(4)
Facade design elements required every 150 ft facing roads and residential areas, § 27-446(10).
Equipment within 300 ft of roads, residential districts, or sensitive receptors enclosed or fully screened, § 27-446(5)(a)
Emergency Response Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or posted contacts, § 27-446(9)(a)
Plan must ensure first responders receive system-specific training; funding not assigned, § 27-446(9)(a)(4)
Hazardous materials disposal addressed in the decommissioning plan, § 27-446(12)(b)(2)
Annual fire safety inspections, § 27-446(9)(a)(5)
Draft Section 27-446(12)(c) to (e) requires an agreement with 110 percent financial security at building permit, immediate notice of cessation, and removal of the data center and all accessory equipment within 6 months after a 12-month presumption of abandonment, but the agreement is not required to be recorded.
One as-built sound study 6 months after occupancy, § 27-446(6)(a)(3)
Sound limit violation treated as a violation of the ordinance, § 27-446(6)(a)(3)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: permitted by right in the C-H-M and Institutional Districts