Borough of Jessup

Anti-Data Center Policies

Jessup borough’s enacted rules impose setbacks from homes and other protected places, plus minimum site sizes, increasing project costs while still allowing data centers. Other listed enacted measures lack enough detail to assess their effects.

Incentives

Financial Incentive
3

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Jessup Borough
Borough Council adopted the rules as Ordinance No. 4 of 2025 on August 19, 2025 and amended them with Ordinance No. 6 of 2025 on November 5, 2025, and a further amendment on an Energy and Technology District, data centers, solar, and wind, which the county reviewed on July 24, 2026, has no confirmed adoption.Jessup Borough, Lackawanna County — data-center ordinance / amendment 6 of 2025

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements17
  • 200-ft side and rear setbacks next to R-1, R-2, R-3, or C-R parcels and 500 ft for diesel generators, § 501.B.9 and § 602.A(62)(e)

  • Sound studies must show compliance with the base noise limits of § 1005; no data center limits stated, § 602.A(62)(c)

  • Pre-construction and post-construction sound studies, § 602.A(62)(c)

  • Generators to be used sparingly; no testing hours or cap, § 602.A(62)(e)

  • Water provider letter certifying capacity, § 602.A(62)(b)

  • Borough stormwater ordinance applies at the Level 4 permit tier, § 602.A(62)(i)

  • EPA Tier 4 generators recommended but not required, § 602.A(62)(c)

  • Utility and regional transmission organization capacity certification; no electrical inspection, § 602.A(62)(b) and (e).

  • Rooftop solar permitted but not required, § 602.A(62)(d)

  • Substations counted as data center accessory uses and fenced with plantings, § 603(24)

  • Landscaped earthen mound optional; no required planted buffer width, § 704.C

  • Lighting plan following Dark Sky principles and § 1007, § 602.A(62)(j)

  • Rooftop and ground equipment fully screened with sound shielding; no 12-ft standard, § 602.A(62)(c) and § 704.A(3).

  • Fire water supply approved annually by the Fire Chief; no annual fire inspection, § 602.A(62)(f)

  • Traffic impact study required unless Council grants an exemption, § 602.A(62)(k)

  • Secondary emergency access required, § 602.A(62)(m)

  • Post-construction sound study is due before occupancy; no reporting after opening

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Energy and Information Technology Overlay District

Sources

current law · Jessup Borough
Borough Council unanimously adopted Ordinance No. 4 of 2025 amending the zoning ordinance and map.Jessup Borough, Lackawanna County — data-center ordinance / amendment 4 of 2025 (2025-08-19)

What this means

A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.

Sources

current law · Jessup Borough
At a special meeting, Borough Council adopted Ordinance No. 4 of 2026, amending the zoning ordinance's noise (Section 1005), vibration (Section 1008), and definitions sections, by a 7 to 0 vote.Jessup Borough, Lackawanna County — data-center ordinance / amendment 4 of 2026 (2026-08-25)

What this means

A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data