Jenkins Township
Anti-Data Center Policies
Jenkins Township’s enacted ordinance restricts where data centers can locate through setbacks, minimum site sizes, and limited eligible areas, but still provides an approval route.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Jenkins TownshipThe rules are in Ordinance No. 001 of 2026, which the Board of Supervisors enacted on July 8, 2026, after two public hearings, amending the township zoning ordinance and map.Jenkins Township, Luzerne County — data-center ordinance (No. 001 Of 2026)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements33
Conditional use approved by the Board of Supervisors; development may begin within 5 years of Master Plan approval, not 1 year, § 508.3 and § 508.6.E
Allowed only in the overlay over the I-2 district, so not in agricultural districts; preserved farmland and agricultural security areas not addressed, § 508.1
65 ft maximum building height, excluding stacks and towers, § 508.5.G
Independent community and fiscal impact analysis must address environmental impacts; no stream buffer set, § 508.4.A
Data Center Campus of multiple data centers defined and regulated under one Master Plan; no separation distance, § 508.2 and § 508.6.A
Section 508.6.A and E require a Master Plan with a development schedule and let phases started within five years proceed without further approval, and a major modification is defined only by an increase in stormwater discharge.
Single limit of 3 dBA above ambient day and night; no absolute dBA limits, § 508.6.I
Section 508.6.I limits a campus to 3 dBA above ambient at receiving properties outside the overlay, using octave band analysis and one-hour averages, but ambient is not defined as L90, no meter or measurement standard is named, and no floor applies.
Sound analyses must use octave band analysis; no dBC limit, § 508.6.I
Sound analyses by a professional sound engineer with the application and post-construction audits through the developer agreement; no building permit study, § 508.6.I.4 and 5
Generator testing only on weekdays from 9:00 AM to 4:00 PM; no hours cap, § 508.6.I.2(b)
Water and sewer feasibility analysis required with the Master Plan; wells and pump tests not addressed, § 508.6.M.1
Water cooling systems must be closed-loop only; evaporative cooling not restricted, § 508.6.M.1
Water use must be reduced to an absolute minimum during drought; no cap or usage reporting, § 508.6.M.1
Water-based cooling sites must have sewer, on-site treatment, or adequate drainage for wastewater discharge; no cooling discharge plan approval, § 508.6.M.2
Stormwater management plan tied to the Master Plan and base stormwater rules, § 508.6.A and F
Decommissioning plan for unusable energy infrastructure such as battery systems; servers and refrigerants not addressed, § 508.6.N
Data and commitments from electricity suppliers showing sufficient capacity; no third-party electrical inspection, § 508.6.M.3.
Electrical power generation is a separate conditional use in the overlay; no separate setbacks, § 508.3.D
Electrical substations counted as accessory uses; no screening or burial standard, § 508.3.E
Firefighting plan with hazard mitigation for battery storage and battery setbacks of 200 ft from buildings and 1,200 ft from residential lines; NFPA 855 not named, § 508.6.L.1
Applicant must show no negative impact on community energy supply; upgrade costs not assigned, § 508.6.M.3
Planted, multi-layered buffer along streets and residential lines; no minimum width, § 508.6.J
Screening plans by a landscape architect to buffer views of facilities; no equipment height or acoustic standard, § 508.6.J
Master firefighting plan coordinated with the fire department, Knox boxes, and a security plan; no annual updates or radio coverage, § 508.6.L
Applicant must meet all reasonable fire department requests for training and equipment, § 508.6.L.1.
Battery storage hazard mitigation plans and setbacks; no spill containment, § 508.6.L.1
Master Plan shows anticipated traffic; no traffic impact study required, § 508.6.A.2
Decommissioning plan with financial security and removal within 6 months of permanent closure or 18 months of non-operation; no 110% amount or closure notice, § 508.6.N
Post-construction sound audits through the developer agreement; no ongoing reports, § 508.6.I.5
Failure to keep the escrow funded results in denial or revocation, and approvals are enforced through a developer agreement, § 508.6.O and P
Section 508.6.O requires any applicant to reimburse the Township for all expert review expenses and keep a replenished escrow of at least $25,000, and this applies to the Master Plan and land development plan, which Sections 508.6.A and 508.7 subject to the Subdivision and Land Development Ordinance.
Developer agreement made public before final approval; no community meeting or project website, § 508.6.P
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Data Center Overlay District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data