Jefferson Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Jefferson Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Jefferson TownshipThe draft, reviewed at the October 1, 2026 joint meeting of the Supervisors and Planning Commission, has no ordinance number and has not been advertised for a public hearing, and the next joint workshop is scheduled for November 5, 2026.Jefferson Township, Berks County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements31
Special exception by the Zoning Hearing Board, § 404.3.O and § 804.14; no approval expiration in the draft
Section 804.14.A.2 and A.3 cap the Data Center at 35 ft including roof-mounted cooling and HVAC equipment and cap accessory uses at 35 ft, but the C-1 district height limit for other principal buildings is not in the amendment text read (September 30, 2026 draft).
200 ft setback from streams and wetlands; no wider buffer on steep slopes, § 804.14.A.10
The Data Center definition (Section 201.4) treats equipment and accessory uses on the same tract or assemblage of adjacent parcels developed under a single land development plan as one unified development, and Section 804.14.A.12 requires 1,000 ft from any data center on another property.
Section 804.14.I.1 sets 5-minute LAeq limits of 50 dBA day and 45 dBA night on residential and other sensitive receiving properties, measured with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994 by a qualified acoustical consultant.
60 dBC day and 55 dBC night at residential and other sensitive receiving properties, § 804.14.I.1
Section 804.14.J.1 to J.3 require preliminary, interim, and as-built noise studies using ANSI S1.4-2014 meters, with the as-built study after the facility is operational and 50 percent occupied, not at full operating load.
Non-emergency generator operation capped at 100 hours per year and barred on unhealthy air days; no weekday daytime limit, § 804.14.U.3
Public water required and wells limited to domestic uses, with a water feasibility study; no pump tests, § 804.14.O and S
Section 804.14.A.15 requires a closed-loop liquid-based cooling system and bars air cooling as the primary system, but the equipment definition includes cooling towers and no water-use rate or noise showing is set for evaporative systems.
Projected water demand and use breakdown disclosed; no cap, reporting, or drought plan, § 804.14.R and S
Cooling fluids and condensate must be hauled off site with no discharge to sewer or stormwater, and a Pollution Prevention and Control Plan covering blowdown is due with the permit application, § 804.14.A.15 and T
Secondary containment of 100% of 8-hour fire suppression water and treatment of contaminated stormwater, § 804.14.A.18 and T.4.c
Natural gas or propane generators that meet state and federal air rules; no Tier 4 standard, and annual reports only if the Board requires them, § 804.14.A.16 and U.1, U.8
Decommissioning removes electronic equipment, batteries, and generators for recycling or reuse where practical; refrigerants not addressed, § 804.14 Decommissioning (second F)
Interconnection agreement showing available capacity due with the special exception application; no electrical inspection, § 804.14.L and N.4.
Energy Usage Plan and 10% renewable procurement above 50 MW; rooftop solar only as documented efforts, § 804.14.N.2 and N.3
Substations are equipment kept in the rear yard and electrical equipment is screened; burial of lines not addressed, § 804.14.A.13 and Design Guidelines (second D.2)
Section 804.14.N requires an assessment identifying detrimental impacts on electric rates or availability attributable to the project and, where capacity is insufficient, the system improvements the applicant must provide, and Section 804.14.Q assigns utility upgrade costs to the applicant.
Berm and dense evergreen and deciduous buffer within the setback from homes and residential districts; no width stated, § 804.14 Design Guidelines (second D.3)
Fully shielded, downward lighting with 0.05 footcandle limit at residential lot lines, § 804.14 Design Guidelines (second D.5)
Ground and rooftop equipment screened with noise mitigation; no height standard, § 804.14 Design Guidelines (second D.2)
Emergency Response Plan reviewed by the fire chief and code official and emergency contacts given to county 911; no annual updates or radio coverage, § 804.14.B and second C
Sections 804.14.G and H require the data center to provide or pay for annual responder training and to supply specialized equipment to the fire and EMS providers, but training before occupancy is not required and the equipment is given to the providers rather than kept on site.
Spill kits, secondary containment, and a hazardous materials inventory; no storage setbacks, § 804.14.A.15 and T
Section 804.14.Y requires a traffic study with every special exception application covering employee, visitor, delivery, construction, and emergency traffic, but no study area reaching the nearest arterial or interchange is stated.
Secondary emergency ingress and egress required; no arterial or collector road requirement, § 804.14.E
The decommissioning provision of Section 804.14 requires removal of electronic equipment, batteries, and generators within six months with funds of at least 125 percent of net cost, but no recorded agreement is required and removal or reuse of buildings is not addressed.
Cost estimate at zoning permit and every fifth year; no first-year update, § 804.14 Decommissioning (second F)
Noise violations must be remediated and decommissioning is enforceable by injunction and lien; no penalties or revocation, § 804.14.J.3 and second F
Sections 804.14.B.14, J.5, and S.11 let the Township retain professionals at the applicant's cost to review fire, noise, and water studies that are filed with the special exception application, so the review is not tied to land development review.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: special exception in the C-1 Commercial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data