Jackson Township requires data centers to be set back from homes and other protected places, raising building and review costs, but they can still be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Jackson TownshipThe current rules are in Ordinance 6-2025, which the Supervisors adopted on January 5, 2026.Jackson Township, Lebanon County — data-center ordinance (No. 6-2025)
What this means
The measure imposes setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements18
67 dBA day and 57 dBA night at the property line, § 27-1429.4.A
Section 27-1429.4.A(1) to (3) require preliminary, interim (building permit), and as-built sound studies six months after occupancy using ANSI S1.4 meters and generally accepted methodology, but the limits apply during normal operation hours and the as-built study is not required at full operating load.
Generator noise must be reported, but no testing limits, § 27-1429.4.B
Vibration study showing none past the property line, § 27-1429.4.C.
Water feasibility study for nonpublic sources, § 27-1429.5.B
Cooling method not required to be disclosed
Projected water demand in feasibility study, § 27-1429.5.B
Section 27-1429.5.D requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, with written approval from the public authority where public sewer is used.
Utility certification of capacity; no third-party inspection, § 27-1429.6.A.
On-site generation is a separate use needing its own approval, § 27-1429.6.B.
25-ft landscape buffer, § 27-1429.2
Equipment within 300 ft enclosed or screened, § 27-1429.3
Emergency plan accepted by the fire department, § 27-1429.7.A
Plan must ensure responder training, § 27-1429.7.A(4)
Annual fire safety inspections, § 27-1429.7.A(5)
Section 27-1429.10.A requires a preliminary traffic impact assessment by a professional traffic engineer for every special exception, but no coverage of construction traffic or study area reaching the nearest arterial or interchange is stated.
As-built sound study after opening, § 27-1429.4.A(3)
As-built noise exceedance is a violation, § 27-1429.4.A(3)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data