Jackson Township
Anti-Data Center Policies
Jackson Township enacted rules requiring setbacks, cooling and water-use controls, and noise limits and testing; approval remains possible, but siting and operating options are narrowed.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Jackson TownshipThe supervisors unanimously approved Ordinance No. 26-05 after a public hearing at their August 20, 2026 voting meeting, according to the meeting minutes, and the signed ordinance is posted in the township's eCode360 New Laws list.Jackson Township, Butler County — data-center ordinance (No. 26-05)
What this means
The measure imposes setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements18
Conditional use, Section 27-1412; no expiration of approval
Section 27-1412.C(1) sets 50 dBA day and 40 dBA night at the property line, but the studies need only follow professional industry standards and no metric, meter class, or measurement procedure is stated for the limits.
60 dBC day and 50 dBC night, Section 27-1412.C(6)
Pre-construction and post-construction studies, Section 27-1412.C(1) and (2)
Closed-loop required, alternatives allowed; evaporative cooling not restricted, Section 27-1412.G(2)
Drought response plan and projected water needs; no cap or reporting, Section 27-1412.G(4) and (6)
Wastewater analysis including HVAC discharge before approval, Section 27-1412.G(7).
EPA Tier 4 with annual air quality testing reports, Section 27-1412.D and F
Thermal Impact Mitigation Plan with waste heat reuse review, Section 27-1412.H.
Electronic Waste Plan for servers, batteries, hazardous materials; refrigerants not named, Section 27-1412.J
Utility interconnection documentation with application; no third-party inspection, Section 27-1412.E(2)
Energy Usage Plan and LEED design; no on-site renewables, Section 27-1412.E
Substations screened; burial of lines not required, Section 27-1412.N
100 ft buffer yard next to residential uses and districts, Section 27-1412.M(2).
Ground equipment enclosed or 12 ft noise-absorbing barrier; rooftop screened on four sides, Section 27-1412.N.
Fire company review, 24-hour contacts, radio coverage; no annual plan updates, Section 27-1412.I
Annual fire safety inspections; no third-party electrical inspection, Section 27-1412.I(1)(e)
Post-construction noise and vibration studies; annual air reports, Section 27-1412.C, D, O
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the LI Large Industrial District