Indiana Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Indiana Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Indiana Township
The Planning Commission recommended approval on August 26, 2026, and on September 9, 2026 the Board of Supervisors voted to advertise a public hearing to be held before its December 9, 2026 meeting.Indiana Township, Allegheny County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, money set aside for eventual removal and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements28
  • Section 375-47(B)(8)(b)[2] allows 35 ft plus up to 10 ft of roof-mounted equipment, but Section (f)[1] requires enclosure of that equipment only within 250 ft of a road or Sensitive Receptor, and the district height limit for other principal buildings is not stated.

  • Narrative on effects on wells, streams, and wetlands; no riparian buffer, § 375-47(B)(8)(d)[2]

  • Section 375-47(B)(8)(d)[3] requires a ten-year growth or expansion plan, but it does not state the electrical demand of each phase and no expansion review is tied to it.

  • 60 dBA day and 50 dBA night at the property line, § 375-47(B)(8)(g)[1]

  • Section 375-47(B)(8)(g)[1] requires preliminary, building permit, and post-construction sound studies with ANSI S1.4 meters, but the post-construction study six months after occupancy is not required at full operating load.

  • Generator testing 8 AM to 6 PM only; no hours cap, § 375-47(B)(8)(g)[3]

  • Vibration study; none perceptible past the property line, § 375-47(B)(8)(g)[4].

  • Hydrogeologic study with aquifer test; bar covers only private potable wells, § 375-47(B)(8)(i)[2], (j)[3]

  • Closed-loop required; open evaporative towers barred absent exemption, § 375-47(B)(8)(j)[1].

  • Projected water demand disclosed; no cap or reporting, § 375-47(B)(8)(i)[1]

  • Section 375-47(B)(8)(i)[1]v requires the applicant to demonstrate adequate wastewater disposal, including cooling tower blowdown, but discharge permits are only provided as they become available under Section (d)[8], not before the zoning permit.

  • Thermal impacts of cooling blowdown disclosed, § 375-47(B)(8)(i)[1]v

  • Electronic Waste Plan for servers and batteries; refrigerants not named, § 375-47(B)(8)(d)[4]

  • Utility capacity verification; no third-party electrical inspection, § 375-47(B)(8)(k)[2].

  • Energy Usage Plan required; no on-site renewables, § 375-47(B)(8)(k)[1]

  • On-site generation is a separate use with its own approval, § 375-47(B)(8)(k)[5].

  • Section 375-47(B)(8)(k)[2] and [3] require a utility capacity verification and a binding commitment to provide or upgrade inadequate facilities, but no identification or disclosure of the required grid upgrades.

  • 50-ft landscape buffer, § 375-47(B)(8)(e)[1]

  • Equipment within 250 ft of roads or receptors enclosed or screened, § 375-47(B)(8)(f)

  • Facade elevations and renderings required, § 375-47(B)(8)(o)[6]

  • Plan reviewed by fire department; no annual update or radio coverage, § 375-47(B)(8)(l)[1]

  • Plan must ensure responder training; no funding, § 375-47(B)(8)(l)[1]iv

  • Annual fire safety inspections, § 375-47(B)(8)(l)[1]v

  • Traffic impacts in narrative only; no study

  • 110% security, but removal may take longer than 6 months, § 375-47(B)(8)(m)

  • Regular energy and emissions reporting, § 375-47(B)(8)(k)[1]v

  • Operations cease for uncorrected noise violations, § 375-47(B)(8)(g)[5].

  • Board may require added studies at applicant cost; no township expert review stated, § 375-47(B)(8)(d)[6]

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed conditional use in the LI district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data