Hilltown Township limits data-center noise and height, requires sound testing and setbacks from homes or other protected places, and permits approval subject to added construction, compliance, and review costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Hilltown TownshipThe standards were set by Ordinance No. 2026-3, which the Board of Supervisors enacted on May 26, 2026, after a public hearing.Hilltown Township, Bucks County — data-center ordinance (No. 2026-3)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements20
750 ft building setback from sensitive receptors, including schools, day care, hospitals, and parks, § 160-23 H10(d) and Part 11
35 ft maximum building height; no rooftop equipment limit, § 160-23 H10(d)
Section 160-23 H10(g)(1) sets 50 dBA day and 45 dBA night at the property line next to residential uses and sensitive receptors, and Section 160-23 H10(g)(2) requires measurement 1.5 meters above ground at the property line under ANSI S1.13-2020.
Generators may exceed limits only weekdays 10:00 a.m. to 3:00 p.m., for one hour per week; testing hours otherwise not limited, § 160-23 H10(g)(5)
Public utilities required with a will-serve letter from the water provider and DRBC approval; no hydrogeologic study, § 160-23 H10(h)(2)
Good faith estimate of daily water use with the application, § 160-23 H10(h)(2)
Public sewer required with a will-serve letter before approval, § 160-23 H10(h)(4)
Compliance with the Air Pollution Control Act and federal hazardous air pollutant standards; no Tier 4 requirement, § 160-23 H10(l)
Will-serve letter or engineering capacity assessment at the conditional use hearing; no electrical inspection, § 160-23 H10(h)(1)
Redundant power equipment permitted by right as data center equipment; not a separate use, § 160-23 H10(c) and Part 11
Substations counted as accessory uses and lines from substations buried unless infeasible; no substation screening or placement, Part 11 and § 160-23 H10(h)(3)
Section 160-23 H10(h)(1) requires a will-serve letter or professional capacity assessment and, where it identifies insufficient capacity, the system improvements the applicant must provide at its own expense.
75-ft Type I buffer yard on all sides, backed by a cash guarantee, § 160-23 H10(e)
Equipment within 1,000 ft of residential uses or sensitive receptors fully enclosed or screened by berm or solid wall; no height standard, § 160-23 H10(f)
Emergency response plan with the application; no fire company review or annual update, § 160-23 H10(m)
Community benefits agreements may include first responder training; not required, § 160-23 H10(p)
Section 160-23 H10(n) requires a traffic study with every conditional use application under Chapter 140 of the Subdivision and Land Development Ordinance, but the data center provisions do not require coverage of construction traffic or a study area reaching the nearest arterial or interchange.
Second means of emergency access required; no arterial or collector access requirement, § 160-23 H10(i)
Updated sound assessments on Township request, up to twice a year; no scheduled reporting, § 160-23 H10(g)(4)
Zoning enforcement or injunctive relief for noise violations, § 160-23 H10(g)(4)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the LI and HI districts