Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Borough of Hatboro.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Hatboro Borough
The Planning Commission reviewed the draft on September 8, 2026, at a meeting where it also considered recommending the borough's rewritten zoning ordinance to Borough Council, and no adoption hearing has been found.Hatboro Borough, Montgomery County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements14
  • Limits vary by district, 50/45 dB only in low-density residential, draft E, Table 1

  • Pure tone limits below PTL curve; no dBC number, draft E.3

  • Sound study with application and as-built study 6 months after occupancy, draft E

  • Water feasibility and hydrogeologic study with aquifer tests; well use not barred, draft F

  • Projected average and peak demand plus quarterly groundwater reports; no drought plan, drafts F and H

  • Disclosure of water recycled or discharged, draft F.4.d

  • Energy generation systems are separate uses needing own approval, draft L.2.

  • Substations counted as accessory use; equipment screening, definitions and draft D

  • Landscape buffer of [25] ft, draft C

  • Equipment within 300 ft of roads or receptors enclosed or screened, draft D

  • First responders must receive system-specific training, draft M.1.d

  • Annual fire safety inspections, draft M

  • Quarterly reports on water withdrawals and groundwater levels, draft H.4

  • Borough may draw on security; operator liable for costs, drafts J and K

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the IN and LMX districts