Loading map…

Harris Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Harris Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Harris Township
The draft is dated September 14, 2026 and was reviewed by the Planning Commission on September 21, 2026, and the township secretary said the Board of Supervisors might first consider it in November 2026, with no public hearing yet scheduled.Harris Township, Centre County — proposed data-center ordinance (None Adopted)

What this means

The proposal would allow data centers by right in designated districts, subject to noise limits and sound testing. The clearer approval route offers a modest benefit, but it does not remove the remaining site and operating conditions.

Restrictions & requirementsHide restrictions & requirements13
  • Permitted in the C-1 and I-1 districts only, § 12-2.4(32)

  • Permitted by right; no conditional use or special exception, § 12-2.4(32)

  • 100-ft buffer yard between data center structures and residential districts, § 12-2.4(32) Landscape Buffering

  • 60 dBA at any property line and 55 dBA at lines abutting residential districts; single limit, § 12-2.4(32) Noise

  • Noise study with land development plans, § 12-2.4(32) Noise

  • Generator testing only between 8:00 a.m. and 6:00 p.m.; no weekday limit or hours cap, § 12-2.4(32) Noise

  • Public water service area required with water authority approval and raw water analysis; wells not expressly barred, § 12-2.4(32) Site Infrastructure

  • Analysis of raw water needs discloses projected use, § 12-2.4(32) Site Infrastructure

  • Public sewer service area required; no wastewater plan, § 12-2.4(32) Site Infrastructure

  • Known impacts on electric rates must be noted, § 12-2.4(32) Site Infrastructure

  • 100-ft buffer yard next to residential districts, § 12-2.4(32) Landscape Buffering.

  • Section 12-2.4(32), Building Design, requires street-facing and residential-facing facades to include architectural features or variations, changes in materials, patterns, textures, and colors on facades of 100 ft or more, and accent materials, but sets no measurable articulation intervals or material and color limits.

  • Ground-mounted equipment screened to the maximum extent practicable, § 12-2.4(32) Landscape Buffering

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: permitted use in the C-1 and I-1 districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data