Loading map…

Hanover Township

Anti-Data Center Policies

Hanover Township’s enacted ordinance requires setbacks from homes and other protected places, along with cooling and water-use rules; approval remains possible, but these limits narrow where and how data centers can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Hanover Township
The current rules are in Ordinance No. 2026-02, which the Board of Supervisors adopted on June 23, 2026.Hanover Township, Northampton County — data-center ordinance (No. 2026-02)

What this means

The measure imposes setbacks from homes or other protected places and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements22
  • Conditional use only in the PIBD Planned Industrial/Business District, § 185-35D(29)

  • PIBD height limit of 45 ft applies; no rooftop limit, § 185-35F

  • Octave-band limits of § 185-20C(3), 3 dB lower at night

  • Octave-band limits include the 0 to 150 Hz band; no dBC limit, § 185-20C(3)

  • Studies of existing and as-built conditions, § 185-54E(37)(i)

  • Testing allowed as routine maintenance with no limits, § 185-54E(37)(d)[4]

  • Vibration study for existing and as-built conditions under a no-discernible-vibration standard, § 185-54E(37)(h) and § 185-20C(2).

  • Water feasibility study for nonpublic supply; no pump tests or cooling-well bar, § 185-54E(37)(c)[2]

  • Closed-loop cooling with no discharge required; evaporative cooling not restricted, § 185-54E(37)(c)

  • Projected water demand disclosed, § 185-54E(37)(c)[2][a]

  • Thermal Impact Mitigation Plan with waste heat reuse or dissipation, § 185-54E(37)(k).

  • Plan for servers, batteries, and hazardous material; refrigerants not named, § 185-54E(37)(j)

  • Utility certification of capacity required; no electrical inspection, § 185-54E(37)(d)[1].

  • Self-supplied energy sources need township approval, § 185-54E(37)(d)[2]

  • Substations counted as accessory uses and screened, § 180-12 and § 185-54E(37)(b)

  • Only rate impacts must be noted, § 185-54E(37)(d)[1]

  • Twenty-foot planting screen, § 185-54E(37)(b)[1]

  • Data center and accessory uses screened; no height or acoustic standard, § 185-54E(37)(b)

  • Plan accepted by the fire department with annual inspections; no annual update, radio coverage, or posted contacts, § 185-54E(37)(e)[1]

  • Annual fire safety inspections; no electrical inspection, § 185-54E(37)(e)[1][e]

  • Decommissioning plan without financial security, § 185-54E(37)(j)

  • As-built noise and vibration studies, § 185-54E(37)(h) and (i)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the PIBD district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data