Hamilton Township
Anti-Data Center Policies
Hamilton Township requires funds for eventual removal, limits noise and requires sound testing, and sets data centers back from homes and other protected places; approval remains possible, but these rules add costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Hamilton TownshipThe standards are in Section 103 of the township's new zoning ordinance, which the Board of Supervisors enacted on August 25, 2026, according to the signed adoption page in the posted 2026 Zoning Ordinance and county planning staff's report to the Monroe County Planning Commission, although the posted copy leaves the ordinance number blank.Hamilton Township, Monroe County — data-center ordinance (2026 Zoning Ordinance, Enacted August 25, 2026 (Number Not Posted))
What this means
The measure imposes money set aside for eventual removal, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements24
The Schedule of Uses in Section 17 lists data centers as a conditional use only in the I Industrial District and as not permitted in every other district, Section 103 allows them only where the Schedule permits, and the I District is mapped on the 2026 Zoning Map.
Conditional use heard by the Board of Supervisors, and the approval expires one year after it is granted if construction has not begun, Sections 16A(3), 17, and 176E.
Section 103D applies the I District minimum lot area of 43,560 square feet (1 acre), below 30 acres, Schedule of Development Standards in Section 17.
Buildings 100 feet or the building height, whichever is greater, from lot lines adjoining a residential district or use, and data center equipment separated from homes by buildings, below 1,000 feet, Section 103D(2) and (3).
Section 103D applies the I District height limit of 50 feet, but Section 26D(1) exempts ventilators and mechanical appurtenances up to 60 feet, Section 17.
The township may require an environmental impact study, but it is not required, and no stream buffer is applied to data centers, Section 103D(4).
A data center on an assemblage of adjacent parcels developed as a unified development, including parcels divided by a road, is treated as one use, but there is no separation distance or combined limit, Sections 12 (Data Center) and 103A.
Expansions of a conditional use are also conditional uses, but no triggers are stated for generators, cooling, substations, or electrical demand, Section 176B(1).
Limits of 60 dBA by day and 50 dBA at night at existing dwellings, with ANSI Type 1 meters, above the 2-point levels, Sections 65B(3) and C, applied by Section 103H.
Noise may not exceed the Ambient Noise Level by more than 10 dBA, with the ambient level measured by a two-week ANSI survey, but the ambient level is an Leq rather than L90, no floor is set, and larger increases are allowed under a noise easement.
The applicant must give anticipated noise levels and documentary evidence of compliance, such as engineering studies, but no post-opening measured study and no stated method for the prediction, Section 65 and 65F, applied by Section 103H.
Withdrawals of 10,000 gallons per day or more need a hydrogeologic impact study under Section 130, but public water is not required for cooling and pump tests are not stated, Section 103F.
Section 130D(6), applied by Section 103F, requires sealed gauges and quarterly reports of water withdrawn for withdrawals of 10,000 gallons per day or more, but there is no drought plan tied to drought declarations.
The applicant must provide an interconnection agreement from the electric provider stating that capacity is available and the data center will be served, as a conditional use standard met before approval and before a zoning permit, Section 103G.
The data center definitions exclude energy generation systems that supply power during normal operations, but no separate approval and standards are set for them, Section 12.
Electrical substations are data center accessory uses counted as part of the use and must meet principal building setbacks, but no screening or buried lines are required, Sections 12 and 103D(5).
Known impacts on electric rates must be noted, but required upgrades and their costs need not be disclosed, Section 103G.
A 50-foot undisturbed buffer along all property lines, with any required landscaping at least 25 feet wide and dead plants replaced, Section 103B.
Data center equipment must be kept away from the street and behind buildings from homes, but no screening standard, Section 103D(3).
A traffic study is required only if the township asks for one, Section 103D(4).
A recorded Decommissioning Agreement with financial security equal to the cost estimate, removal begun within 6 months and finished within 12 months of cessation, but the security is not 110 percent of the cost and the removal period exceeds 6 months, Section 78C and D, applied by Section 103I.
The cost estimate is updated every fifth year of operation with the security adjusted to match, but not after the first year, Section 78D(3) and D(4)(c).
Quarterly water withdrawal reports apply only to withdrawals of 10,000 gallons per day or more, and no noise or power reporting is required, Section 130D(6), applied by Section 103F.
Enforcement notices under Section 616.1 and remedies under Section 617.2 of the Municipalities Planning Code, but no stated grounds for revoking an approval, Sections 184C and 185.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the I Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data