Guilford Township
Anti-Data Center Policies
Guilford Township requires technical studies and utility checks, noise limits and sound testing, and water-supply measures for data centers. They may still be approved, but must meet added requirements that increase review and compliance costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Guilford TownshipThe current rules are in Ordinance No. 2026-06, which the Board of Supervisors adopted on March 19, 2026.Guilford Township, Franklin County — data-center ordinance (No. 2026-06)
What this means
The measure imposes technical studies and utility checks, noise limits and sound testing and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements22
Permitted by right, § 3.5.A(30)
Loading areas 200 ft from homes; 50-ft buffer yard beyond base setback is not a setback, § 7.19(3), (8)
55 dBA day and 45 dBA night at the property line, § 7.19(15)
Section 7.19(15) bars noise more than 10 dBA above pre-development ambient levels, with 55 dBA day and 45 dBA night ceilings, measured with ANSI S1.4-2014 meters.
Octave-band frequency analysis per ANSI S1.11; no dBC limit, § 7.19(15)
Section 7.19(15) requires a preliminary study before preliminary approval, an interim study at building permit, and an as-built study six months after occupancy, using ANSI S1.4-2014 meters.
Vibration study showing none past the property line, § 7.19(16).
Public water required; non-potable wells allowed after pump-tested study, § 7.19(11)
Annual water use report; no cap or drought plan, § 7.19(14)
Section 7.19 requires the applicant to show that domestic, cooling, and industrial wastewater disposal has been provided for and approved by the Sewage Enforcement Officer or PA DEP, with no stated timing.
Substations part of the use and screened, § 7.19(4)
50-ft buffer yard with double SALDO screening or 12-ft berm, § 7.19(3)
Fully shielded with 0.1 footcandle property-line limit, § 7.19(5)
Ground and rooftop equipment screened, § 7.19(2)
Plan reviewed by fire department; no updates, radio, or posted contacts, § 7.19(9)(a)
Responders must receive training; cost not assigned, § 7.19(9)(a)(v)
100-ft tank setback from the building with spill containment, § 7.19(6).
Annual fire safety inspections, § 7.19(9)(a)(vi)
Section 7.19(10) requires a traffic impact study in every case addressing daily operational traffic and emergency access.
Annual water use and well level reports, § 7.19(14)
Owner must promptly remediate sound violations found by as-built study, § 7.19(15)(c)
Township acoustical expert approves studies; cost not assigned, § 7.19(15)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Permitted by right in the Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data