Greenwich Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Greenwich Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Greenwich Township
The draft has no ordinance number yet, the township administrator provided the advertised draft by email on October 20, 2026, and the date of the hearing and adoption vote was not given.Greenwich Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements29
  • Conditional use limited to the Commercial district for small data centers and the Industrial district for large ones, Sections 407.1.C.11 and 408.1.C.4

  • Allowed only in the Commercial and Industrial districts, so not permitted in agricultural districts; preserved farmland and agricultural security areas not addressed, Sections 407 and 408

  • 60% building coverage and 70% lot coverage caps for large data centers, and a 50,000 sq ft size limit in the Commercial district; no absolute footprint or megawatt cap, Sections 301 and 503.35.A

  • 60 ft maximum for large data centers and their equipment; no rooftop equipment limit, Section 503.35.A.2 and A.3

  • Groundwater protection and hydrological study counted under water criteria; no riparian buffer or environmental impact assessment, Section 503.35.H

  • 67 dBA weekday daytime and 57 dBA night, weekend, and holiday at any lot line, Section 503.35.E

  • Baseline noise measured in the preliminary study, but no cap above background, Section 503.35.F.1

  • Section 503.35.F requires a preliminary study with the conditional use application, an interim study in land development review, and an as-built study within six months of occupancy, using ANSI S1.4-2014 meters and generally accepted criteria.

  • Generator maintenance and testing capped at 8 hours per month, with no daytime-only limit, Section 503.35.G.2.c

  • Vibration study by a certified analyst and no vibration discernible beyond the property, Section 503.35.F and H.

  • Public water connection required unless the township allows another source, with a sealed study of wells within 1,000 ft and safe yield; no pump tests, Section 503.35.H

  • Closed-loop water recirculation required; evaporative cooling not restricted, Section 503.35.H

  • Raw water needs for domestic and cooling uses must be analyzed; no daily cap, reporting, or drought plan, Section 503.35.H

  • Public sewer connection with a will-serve letter; no cooling discharge plan, Section 503.35.H

  • Diesel generators must meet EPA Tier 4 standards; no annual testing or reports, Section 503.35.G.2.a

  • Operations producing heat must be imperceptible beyond the lot lines; no thermal plan or waste heat reuse review, Section 503.35.H

  • Decommissioning removes all components, and waste disposal must meet state and federal rules; no recycling plan, Section 503.35.H and I

  • Interconnection agreement from the electric provider confirming capacity; no third-party electrical inspection, Section 503.35.H.

  • Rooftop solar covering at least 65% of the principal building roof; no energy usage plan, Section 503.35.G.1

  • Battery storage must follow applicable codes; no NFPA 855 reference, Section 503.35.G.2

  • Section 503.35.H requires an interconnection agreement from the electric service provider stating available capacity and the grid upgrades required before service, with all upgrade costs borne by the applicant.

  • 50-ft landscaped buffer with a 15-ft berm along all lot lines for large data centers, Section 503.35.B

  • All rooftop and ground equipment screened from public view to at least equipment height; no 12-ft or acoustic standard, Section 503.35.C

  • Secondary containment for generator fuel sized to 110% and fenced outdoor fuel storage; no storage setbacks, Section 503.35.G.2.b and H

  • Secondary emergency access approved with the fire company; no arterial or collector road requirement, Section 503.35.D

  • Security equal to net decommissioning cost after salvage, notice within 30 days, and removal within 12 months, Section 503.35.I

  • Section 503.35.I requires the net decommissioning cost estimate to be resubmitted after the first year of operation and every fifth year, and requires the owner to post and maintain security in an amount equal to the Net Decommissioning Cost.

  • One as-built study after occupancy, with later studies at township request, Section 503.35.F

  • Owner must promptly remediate noise and vibration violations, Section 503.35.F

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the C and I districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data