Franklin Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Franklin Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Franklin Township
The draft, numbered Ordinance No. 2 of 2026, was provided by the township secretary by email on October 28, 2026, and the Supervisors have set a public hearing for November 17, 2026.Franklin Township, Erie County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements31
  • Data centers, accessory uses and ground-mounted equipment set back 1,320 ft from residential property lines and residential districts, draft Section 206.49 Section 3, Setbacks

  • Ground-mounted equipment 1,320 ft from property used for community purposes, but buildings only 100 ft from non-residential uses; schools, day care, hospitals and parks not named, draft Section 206.49 Section 3, Setbacks

  • 50-ft maximum including roof-mounted equipment, which exceeds the 45-ft I-1 district limit, draft Section 206.49 Section 3, Dimensional Standards, and Section 204 table

  • Environmental impact assessment covering riparian buffers and wetlands, and no data center in the 100-year or 500-year floodplain; no buffer width set, draft Section 206.49 Section 3

  • Base ordinance octave-band limits at residential and industrial boundaries apply through Article 3 performance standards; no separate day and night limits, draft Section 206.49 Section 3 and 2015 Zoning Ordinance Section 306.7

  • Base ordinance octave-band limits include 72 dB below 75 Hz and 67 dB from 75 to 150 Hz, in older bands rather than at 31.5, 63 and 125 Hz, 2015 Zoning Ordinance Section 306.7

  • Preliminary study in the special exception process and an acoustic study by an acoustical engineer with the land development application; no post-opening study, draft Section 206.49 Section 3, Noise and Vibration

  • Vibration study showing no vibration perceptible beyond the property line; no numeric limit, draft Section 206.49 Section 3, Noise and Vibration

  • Connection to public water required with provider capacity certification; on-site wells not addressed, draft Section 206.49 Section 3, Water Utilization

  • Water Utilization Report must state cooling system type and efficiency, draft Section 206.49 Section 3, Water Utilization

  • Daily intake volume and sources disclosed; no metered reporting or drought plan, draft Section 206.49 Section 3, Water Utilization

  • Disposal of domestic and cooling or industrial wastewater must be provided and approved by the Erie County Department of Health or DEP, draft Section 206.49 Section 3, Wastewater

  • Compliance with the township stormwater ordinances stated as applying; no added treatment or containment for fuel and transformer areas, draft Section 206.49 Section 3, Water Utilization

  • Backup generators must meet EPA Tier 4 or equivalent, with annual testing and reports to the Township, draft Section 206.49 Section 3, Air Quality

  • Thermal Impact Mitigation Plan with waste heat reuse or dissipation strategies; no modeled property-line temperatures, draft Section 206.49 Section 3, Heat Mitigation

  • Electronic Waste Plan for servers, batteries and hazardous materials; no disposal contract kept in effect, draft Section 206.49 Section 3, Electronic Waste

  • Energy Management Plan with annual demand, supply sources and renewable efforts; no peak demand by phase or solar requirement or incentive, draft Section 206.49 Section 3, Energy Use

  • Generation for normal operations is a separate use with separate permits; no equal noise and emission standards stated, draft Section 206.49 Sections 1 and 3, Energy Use

  • Accessory electrical substations must be screened; no placement or buried line standard, draft Section 206.49 Section 3, Screening

  • Battery storage must meet NFPA 855 with battery-specific fire suppression, draft Section 206.49 Section 3, Safety

  • Known impacts on electricity rates or availability must be disclosed; no upgrade costs or service agreement, draft Section 206.49 Section 3, Energy Use

  • 100-ft buffer along residential and community properties with 8-ft native evergreens every 25 ft; no replacement of dead plants, draft Section 206.49 Section 3, Landscape Buffer

  • Base ordinance requires fully shielded external lights and no objectionable glare on adjoining properties, and the draft bars glare perceptible at the property line; light trespass not barred, draft Section 206.49 Section 3 and 2015 Zoning Ordinance Section 306.4

  • Structures must be harmonious and compatible with surrounding properties; no measurable facade standards, draft Section 206.49 Section 3, Building Placement and Orientation

  • Ground equipment enclosed where feasible or behind a solid noise-absorbing barrier, and rooftop equipment screened on all four sides; no screen height standard, draft Section 206.49 Section 3, Screening

  • Emergency Response Plan accepted by the fire department and emergency services, with 24-hour contact signage; no annual update or walk-through, draft Section 206.49 Section 3, Safety

  • Types and storage duration of materials disclosed in the impact analysis; no storage setbacks, containment or spill plan, draft Section 206.49 Section 3

  • Annual fire safety inspections by a qualified professional; no report to the fire official or correction deadline, draft Section 206.49 Section 3, Safety

  • Vehicle trips described in the impact narrative only; no traffic impact study, draft Section 206.49 Section 3

  • Annual emissions reports only; no ongoing noise, water or power reports, draft Section 206.49 Section 3, Air Quality

  • Entrance signage must name the company and owner or representative; developer and end user not required before approval, draft Section 206.49 Section 3, Safety

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: special exception in the I-1 Industrial District