Borough of Franklin Park
Anti-Data Center Policies
Franklin Park borough limits data-center noise, requires sound testing, and sets setbacks from homes and other protected places. Projects can still be approved, but these rules add costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Franklin Park BoroughThe current rules are in Ordinance No. 697-2026, which Borough Council adopted on June 17, 2026, amending Chapter 212 Zoning.Franklin Park Borough, Allegheny County — data-center ordinance (No. 697-2026)
What this means
The measure imposes noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements20
Ordinance 697-2026 Section 6 adopts a new Zoning Map showing a Data Center Overlay, and § 212-1906(G)(1) permits data centers by conditional use in the overlay, but the text read does not expressly exclude data centers from all other districts.
67 dBA day, 57 dBA night at property line, § 212-1906(G)(5)(a)
Section 212-1906(G)(5) requires preliminary, interim, and as-built sound studies with ANSI S1.4 meters, but the as-built study six months after occupancy is not required at full operating load.
Vibration study; none perceptible beyond property line, § 212-1906(G)(5)(c).
Water feasibility study if nonpublic water, § 212-1906(G)(6)
Projected water demand disclosed in feasibility study, § 212-1906(G)(6)
Section 212-1906(G)(6)(d) requires the applicant to demonstrate that cooling and industrial wastewater disposal is approved by the Sewage Enforcement Officer or DEP as part of the conditional use showing, which precedes the zoning permit.
E-waste, batteries, and cooling fluids disposed per regulations, § 212-1906(G)
Utility capacity documentation required; no electrical inspection, § 212-1906(G)(7).
On-site generation is a separate use with its own approval, § 212-1906(G)(7).
Known rate and availability impacts must be noted, § 212-1906(G)(7)
Landscape buffer per Article 2000 and M2 rules, § 212-1906(G)(4)
Emergency plan accepted by fire department, § 212-1906(G)(8)
First responders must receive system training, § 212-1906(G)(8)
Annual fire safety inspections, § 212-1906(G)(8)
Bond with 15% contingency, but removal within 18 months, § 212-1906(G)(10)
Bond reviewed at least every 5 years, not after year one, § 212-1906(G)(10)
Biannual sound studies and semi-annual water test reports, § 212-1906(G)(5)-(6)
Noise exceedance is an ordinance violation, § 212-1906(G)(5)
Section 212-1906(G)(5)(a) lets the Borough request an independent acoustic study at the applicant's cost during the conditional use and building permit stages, not in land development review.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Data Center District Overlay
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data