Loading map…

Franconia Township

Anti-Data Center Policies

Franconia Township’s enacted ordinance allows data centers to seek approval but limits where and how they can operate, with setbacks, minimum site sizes, noise limits and sound testing.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Franconia Township
The detailed standards in Section 145-84.3 were added by Ordinance No. 434, which the Board of Supervisors adopted on July 20, 2026, building on data center definitions in Ordinance No. 430, adopted May 19, 2025.Franconia Township, Montgomery County — data-center ordinance (No. 434)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements18
  • 50-ft height limit, § 145-84.3C

  • Section 145-84.3I(2) sets 45 dBA day and 40 dBA night at the property line, and Section 145-84.3I(1)(b) and (c) call for measurement at all property lines under applicable ANSI standards and generally accepted criteria, but no specific standard, metric, or meter class is named.

  • 60 dBC day, 50 dBC night, § 145-84.3I

  • Pre-construction and post-construction studies, § 145-84.3I

  • Vibration standards and pre/post studies, § 145-84.3I

  • Closed-loop circulation required; evaporative cooling not restricted, § 145-84.3G

  • Drought response plan required; no use cap or reporting, § 145-84.3G

  • EPA Tier 4 diesel generators; no annual emissions testing, § 145-84.3F

  • Thermal impact mitigation plan with waste heat reuse review, § 145-84.3H.

  • E-waste plan for servers and batteries; refrigerants not named, § 145-84.3K

  • Section 145-84.3D(2) requires an energy usage plan with annual electricity demand, supply sources, storage, and backup power, and solar on 50 to 80 percent of unused roof space, but the plan need not state peak demand by phase or a design efficiency figure.

  • Evergreen screen at least 10 ft high; berm within 250 ft, § 145-84.3C

  • Facade offsets every 150 ft and material limits, § 145-84.3B.

  • Hazardous materials covered in waste plan only, § 145-84.3K

  • Plan, start within 1 year, finish within 18 months; security optional, § 145-84.3M

  • Regular reporting of energy efficiency and emissions data, § 145-84.3D

  • Corrective action within 30 days and remediation within 90 days for noise, § 145-84.3I

  • Applicant public meeting before Planning Commission and project website to final approval, § 145-84.3N

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data